Alabama Power BWT Electrical Utility Service J&A

SOL #: W9127826CA006JustificationSole Source

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W074 ENDIST MOBILE
MOBILE, AL, 36602-3630, United States

Place of Performance

Atlanta, GA

NAICS

Electric Power Distribution (221122)

PSC

Electric Services (S112)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 4, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, W074 ENDIST MOBILE, is publishing a Justification and Approval (J&A) for a new Firm Fixed Price (FFP) contract (W9127826CA006) to procure electrical utility services for the Black Warrior & Tombigbee (BW&T) Demopolis/Holt Project Office. This is a sole-source procurement for Alabama Power Company due to state law. The J&A was published on March 4, 2026.

Purpose & Scope

This J&A provides the justification for awarding a sole-source contract to Alabama Power Company for electric utility services. The services are essential for site offices, parks, and compounds at the BW&T Demopolis/Holt Project Office. The procurement is conducted using other than full and open competition, citing Alabama State Law (§ 37-14-1) which establishes exclusive service territories for electric suppliers, making Alabama Power Company the only legally authorized provider for this specific geographic area.

Contract Details

  • Contract Type: Firm Fixed Price (FFP)
  • Funding: Non-expiring Operation & Maintenance General (O&MG) funding
  • Period of Performance: Ten (10) years
  • Estimated Cost: The J&A includes an estimate of future costs with an annual increase based on average yearly costs from 2026-2036.

Eligibility / Set-Aside

This is a sole-source procurement to Alabama Power Company. There is no set-aside designation as competition is precluded by Alabama State Law (§ 37-14-1), which grants Alabama Power Company exclusive service rights in the project's location.

Submission & Evaluation

This document is a Justification and Approval (J&A) for a sole-source procurement, not a solicitation. Therefore, there are no proposal submission requirements or evaluation criteria for potential bidders.

Additional Notes

The authority for this sole-source action is 10 U.S.C. 3204(a)(5) as implemented by RFO 6.103-5. Failure to approve this justification would result in a complete loss of power, posing significant safety and security hazards. Market research confirmed no other sources are available. The contract will include an annual review to explore competitive alternatives and market changes.

People

Points of Contact

Files

Files

Download

Versions

Version 1Viewing
Justification
Posted: Mar 4, 2026
Alabama Power BWT Electrical Utility Service J&A | GovScope