Alameda Zone 7 PL 84-99 Repairs (Phase 2 and 3)

SOL #: W912P726BA005Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W075 ENDIST SAN FRAN
SAN FRANCISCO, CA, 94102-3406, United States

Place of Performance

Place of performance not available

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Other Non Building Facilities (Y1PZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 9, 2026
2
Last Updated
May 12, 2026
3
Submission Deadline
May 11, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers (USACE), San Francisco District, is soliciting bids for the Alameda Zone 7 PL 84-99 Repairs (Phase 2 and 3) project. This Total Small Business Set-Aside opportunity involves repairing storm-damaged flood control channels in Alameda County, California, with an estimated construction magnitude between $10,000,000 and $25,000,000. Bids are due May 11, 2026, at 12:00 PM PDT.

Scope of Work

This Operations and Maintenance project addresses erosion and bank failures in flood control channels caused by atmospheric rivers between December 2022 and March 2023. The work aims to restore earthen slopes to their original grade.

  • Phase 2 (Base Contract): Encompasses 21 repair sites across Arroyo de la Laguna, Arroyo del Valle, Alamo Canal, Arroyo Mocho, and Tassajara Creek, scheduled for completion in 2026.
  • Phase 3 (Optional Work): Includes 20 repair sites in South San Ramon Creek, Alamo Canal, and Alamo Creek, to be performed in 2027 if the option is exercised. Repair methods include toe erosion repair using 1½-ton rock riprap armoring and full bank repair involving excavation, riprap, uniaxial geogrid, and hydroseeding. Strict environmental controls are required, including in-water work windows (June 15 - October 15) and protection for special-status species.

Contract & Timeline

  • Contract Type: Firm Fixed-Price (FFP)
  • Estimated Value: $10,000,000 - $25,000,000 (Government estimate: $17,810,678.90)
  • NAICS Code: 237990 (Other Heavy and Civil Engineering Construction)
  • PSC Code: Y1PZ (Construction Of Other Non Building Facilities)
  • Set-Aside: Total Small Business Set-Aside (Size Standard: $45,000,000)
  • Period of Performance: 202 calendar days for Phase 2 (Base) and 202 calendar days for Phase 3 (Option).
  • Site Visit: April 20, 2026, at 9:00 AM PDT at 6900 W Las Positas Blvd, Pleasanton, CA 94588.
  • Bid Submission Deadline: May 11, 2026, at 12:00 PM PDT.
  • Public Bid Opening: May 11, 2026, at 1:00 PM PDT via Microsoft Teams.

Submission & Evaluation

Bids must be submitted electronically through the Procurement Integrated Enterprise Environment (PIEE) website. Offerors are responsible for monitoring PIEE and SAM.gov for any amendments. A Bid Guarantee (SF-24) of 20% of the bid price or $3,000,000 (whichever is less) is required, along with Performance and Payment Bonds. Prospective offerors and their subcontractors must be registered in SAM.gov and PIEE to view solicitation information and submit offers. Evaluation criteria will be detailed in the "Instructions, Conditions and Notices to Offerors and Evaluation Criteria for Award" section of the solicitation.

Additional Notes

The project is associated with the PL 84-99 Rehabilitation Program. Registration in SAM.gov and PIEE should be completed at least one week prior to the anticipated solicitation release date. Plans and specifications are only available for download from PIEE.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
View
View
View
View

Versions

Version 4Viewing
Solicitation
Posted: May 12, 2026
Version 3
Solicitation
Posted: Apr 29, 2026
View
Version 2
Solicitation
Posted: Apr 23, 2026
View
Version 1
Solicitation
Posted: Apr 9, 2026
View