Albeni Falls Dam (AFD) CO2 Cylinder Hydrostatic Testing
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
The Contractor shall provide all labor, tools, equipment, test and inspection equipment, materials, parts, quality control, and transportation necessary to perform hydrostatic testing of the carbon dioxide (CO2) compressed gas cylinders ('the cylinders') that are part of the CO2 Fire Suppression System at Albeni Falls Dam. The Contractor shall be responsible for ensuring all parts and services provided under this contract that are in accordance with the terms and conditions outlined herein and conform to applicable codes (CGA and DOT, as applicable), industry standards, the original manufacturer's equipment specifications (or equivalents), and other requirements. For more detail, please see the attached solicitation.
All offers must be submitted before Decemeber 26, 2025 at 12:00 PM PST. Any questions or concerns must be submitted by December 26, 2025 at 09:00 AM PST.