ALF Heavy and Normal Maintenance on the Rocky Gap ATV Trail system
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Allegheny National Forest is soliciting quotations for Heavy and Normal Maintenance on the Rocky Gap ATV Trail system. This acquisition is a Total Small Business Set-Aside for trails maintenance services, requiring contractors to furnish all labor, supervision, equipment, and materials. The anticipated award is a Firm Fixed Price Purchase Order. Quotations are due by April 3, 2026.
Scope of Work
The contractor will perform comprehensive trails maintenance, including:
- Normal and heavy tread maintenance (ruts/holes up to 18" deep)
- Seeding, mulching, and silt fencing
- Riprap (R-3) installation
- Collection and disposal of litter and trash
- Vegetation cutting and removal, under brushing
- Erosion control and ditch cleaning
- Trail width must be less than or equal to 50 inches.
Contract & Timeline
- Contract Type: Request for Quotation (RFQ), anticipated Firm Fixed Price Purchase Order.
- Period of Performance: Date of Award – June 30, 2026 (target completion May 21, 2026).
- Set-Aside: Total Small Business Set-Aside (NAICS 237990, size standard $45,000,000).
- Published Date: March 13, 2026.
- Questions Due: March 27, 2026, 1700 CT.
- Quotations Due: April 3, 2026, 1700 CT.
Evaluation & Submission
Award will be made to the offeror with the highest technically rated quotation, fair and reasonable pricing, and acceptable or neutral past performance. Evaluation criteria include Technical Approach, Price, and Past Performance.
Required Submission Documents:
- SF-1449
- Schedule of Items with pricing
- Completed Experience Questionnaire (Attachment 8)
Additional Notes
- Contractors must be registered and active on www.sam.gov.
- Site visits are highly encouraged and can be arranged by contacting Kelsey Meacham (kelsey.meacham@usda.gov).
- All equipment must be cleaned to prevent invasive species introduction. OSHA-approved spill kits are required.
- Wage Determination 1981-0682 (Forestry PA Statewide) applies.