Amendment 01 Textile Warehouse Office Addition and Renovation
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
This Amendment 01 to the Textile Warehouse Office Addition and Renovation solicitation from the Department of the Army, MICC-FT Leavenworth, seeks a qualified Total Small Business general contractor for Sustainment, Restoration, and Modernization (SRM) of the USDB Textiles Warehouse (Building B1146) at Fort Leavenworth, KS. The project includes a new office addition, recessed truck dock, and extensive renovations. Proposals are due April 14, 2026.
Scope of Work
The project involves the construction of an approximate 1,280 SF metal building office addition and a new recessed truck dock. The scope also includes comprehensive repairs and renovations such as: repair/replacement of mechanical, electrical, and fire protection/detection systems; interior remodeling (carpentry, painting, flooring, wall coverings); and demolition work. The contractor must provide stamped structural engineered drawings for the addition and foundations.
Key updates and clarifications from recent documents include:
- Fire Safety: Sprinkler heads must be dropped into existing and new racks per NFPA 13, with the contractor calculating final fire pump size. The existing fire sprinkler system requires modification, including in-rack sprinkler heads and potential pump replacement, and the fire alarm system needs reprogramming.
- Building Structure: The contractor is responsible for final structural designs for the new addition and concrete designs for foundations and dock retaining walls.
- Utilities: Installation of new gas supply, communications infrastructure (fiber optic and copper), and sewer service line.
- Electrical: Demolition of existing NEC equipment and installation of new, with options for reusing the existing electrical panel if compliant.
- Construction Methods: Contractors have the option to construct the roof and walls of the addition using either traditional metal building methods or metal studs with exterior siding, roof windows, doors, and detailing to match the existing building.
- Asbestos Abatement: Detailed specifications for asbestos abatement are included, requiring compliance with OSHA, EPA, and other regulations.
- Telecommunications: Specific hardware and configuration for an 18U telecommunications rack installation are detailed.
Contract & Timeline
- Contract Type: Solicitation (Amendment 01)
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Z2JZ (Repair Or Alteration Of Miscellaneous Buildings)
- Response Date: April 14, 2026, 7:00 PM ET
- Published Date: March 18, 2026
- Place of Performance: Fort Leavenworth, KS
Special Requirements & Compliance
This acquisition requires a general contractor with experience managing numerous task orders, construction scheduling, cost estimating, quality control, and subcontractor coordination. Bidders must be registered as an SBA and on SAM.gov. Individual task orders will require bonding per FAR 28.102. The Construction Wage Determination (KS20260053) for Leavenworth County, Kansas, specifies prevailing wage rates and fringe benefits, which are critical for labor cost estimation. The Buy-American Act and liquidated damages are included. Contractors must divert at least 60% of demolition/construction waste from landfills.
Contact Information
- Primary: Felipe D. Zaragoza, felipe.d.zaragoza.civ@army.mil, 520-944-3862
- Secondary: Jennifer S. Walker, jennifer.s.walker12.civ@army.mil, 520-945-9613