Amendment 1 and Q&A
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Embassy Madrid, under the Department of State, has issued Amendment 1 and Q&A for a Combined Synopsis/Solicitation concerning an ADA/ABA Accessible Bathroom Renovation project in Madrid, Spain. This amendment provides detailed specifications, drawings, and clarifications for the renovation of a ground floor bathroom to meet U.S. ADA/ABA standards and applicable Spanish building codes. Proposals are due by June 30, 2026, at 3:30 PM UTC.
Scope of Work
The project involves a comprehensive renovation, including demolition, masonry, coating, carpentry, electrical, ventilation, plumbing, sanitary accessories, finishes, and fire system work. Key modifications detailed in Amendment 1 include:
- Relocating the sink/lavatory to the center of the room for 360° accessibility and ADA compliance.
- Converting the existing bathtub into an ADA-compliant roll-in/accessible shower with a zero-threshold design and sliding glass door. Specifications (Attachment 6) further detail requirements for a site visit, submittals (product data, shop drawings, samples), safety practices (SSSP), quality control (QCP), testing, and commissioning. Applicable codes include NFPA 72 (2019 Edition).
Key Documents & Clarifications
- Amendment 001.pdf: Details the sink relocation, bathtub conversion, and extends the submission deadline.
- Attachment 6 - Specifications.pdf: Provides the detailed Statement of Work (SOW), safety, quality, testing, and acceptance criteria. It also notes a Period of Performance of 3-5 weeks from Notice to Proceed.
- Attachment 5 - Drawings.pdf: Contains critical design details, proposed layouts, dimensions, and a comprehensive component list (Bill of Materials) for the renovation.
- QA RFQ No. 19SP5026Q0020.pdf: Clarifies aesthetic requirements for doors, countertops, faucets, and fixtures, which should match provided photos.
Contract & Timeline
- Opportunity Type: Combined Synopsis/Solicitation (Amendment)
- Product Service Code: Z1FZ (Maintenance Of Other Residential Buildings)
- Place of Performance: U.S. Embassy Madrid, Spain
- Set-Aside: None specified
- Response Due: June 30, 2026, at 3:30 PM UTC (17:30 local Madrid time)
- Published Date: June 16, 2026
Special Considerations
Work will occur in an occupied diplomatic facility, requiring careful coordination of access, working hours, and security to minimize disruption. Bidders must ensure their proposals align with the visual examples provided in the Q&A for aesthetic elements.