ANJO-REPLACE ELECTRIC SUPPLY WIRE

SOL #: 140P5326Q0012Solicitation

Overview

Buyer

Interior
National Park Service
SER NORTH MABO (53000)
GATLINBURG, TN, 37738, United States

Place of Performance

Place of performance not available

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Electrical And Electronic Equipment Components (J059)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 19, 2026
2
Submission Deadline
Feb 26, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service (NPS), specifically the SER NORTH MABO (53000) office under the Department of the Interior, is soliciting proposals for the replacement of the electric supply wire at the Andrew Johnson Homestead building within the Andrew Johnson National Historic Site. This is a Total Small Business Set-Aside opportunity, with quotations due by February 26, 2026, at 3:00 PM ET.

Scope of Work

This project involves replacing the existing power feed from an aboveground electrical box to the basement of the Andrew Johnson Homestead. Key tasks include:

  • Directional drilling to install approximately 210 linear feet of 2.5-inch HDPE SDR 11 electrical conduit with new conductors.
  • Installation of an additional 2-inch SDR 11 HDPE telecommunications conduit for fiber optic cable, also via directional drilling.
  • Provision of all necessary supervision, labor, equipment, testing, and supplies.
  • Coordination with the Greeneville Energy Authority (GEA) for connection and energization of the new electrical system.
  • Adherence to Attachment 1 (Statement of Work) and associated project specifications, including GEA and National Electric Code (NEC) requirements.

Contract & Timeline

  • Contract Type: Firm Fixed Price.
  • Period of Performance: March 3, 2026, to April 27, 2026.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5). Only small business concerns are solicited.
  • NAICS Code: 238210 (Electrical Contractors and Other Wiring Installation Contractors) with a size standard of $19 million.
  • Response Date: February 26, 2026, at 3:00 PM ET.
  • Published Date: February 19, 2026.

Evaluation & Submission

Award will be made on a Lowest Price Technically Acceptable (LPTA) basis. Technical acceptability will be evaluated based on Attachment 3 (LPTA Technical Acceptability - Construction), which requires details on relevant experience (directional drilling/underground conduit), key subcontractors, and a compliance checklist for SOW/Specs. Price will be evaluated for completeness and reasonableness among technically acceptable quotations.

Quotations must be submitted via email to arcoiris_cuetara-higa@nps.gov with the subject line: “Quotation – RFQ 140P5326Q0012 – ANJO Replace Electric Supply Wire”. Required submissions include a completed SF 1442, price quotation, Attachment 3, and Attachment 4.

Special Requirements & Notes

  • A site visit may be requested by February 20, 2026.
  • Performance and Payment Bonds are not required.
  • DOL Wage Determinations (TN20260160) for Greene and Johnson Counties, Tennessee, apply to this project.
  • The "Warranty of Construction" clause (FAR 52.246-21) will be included.
  • Strict adherence to environmental regulations for directional drilling, including fluid management and disposal, is required. Archeological protection protocols must be followed.
  • Bidders should review Attachment 2 for site maps, electrical drawings, and GEA standards, and Attachment 4 for Limitation on Subcontracting reporting requirements.

People

Points of Contact

Cuetara-Higa, ArcoirisPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Solicitation
Posted: Feb 19, 2026
ANJO-REPLACE ELECTRIC SUPPLY WIRE | GovScope