Anniston Army Depot FORGE II Other Transaction Authority (OTA) Request for Project Proposal (RPP) - W91QEY-26-R-A002

SOL #: 1a06e41c09374e34b65d3d0ff6a3196fSpecial Notice

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QM MICC TSC
FORT SAM HOUSTON, TX, 78234-0000, United States

Place of Performance

Anniston, AL

NAICS

Commercial and Institutional Building Construction (236220)

PSC

No PSC code specified

Set Aside

No set aside specified

Timeline

1
Posted
Jun 10, 2026
2
Action Date
Jun 29, 2026, 12:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Mission & Installation Contracting Command (MICC) Theater Support Center (TSC), on behalf of Anniston Army Depot (ANAD), has issued a formal Request for Project Proposals (RPP) under Other Transaction Authority (OTA) (10 U.S.C. 2808a) for the FORGE II Military Construction (MILCON) project. This opportunity, RPP number W91QEY-26-R-A002, seeks proposals for the design and construction of four major facilities at ANAD, Alabama. The anticipated total funding for the MILCON effort is approximately $660 million, with additional optional funding for equipment and Restore and Modernize (R&M) projects. Project Proposals are due by June 29, 2026, at 7:00 AM CDT.

Scope of Work

This project involves the design and construction of four distinct facilities: a Component Remanufacture Facility, a Missile Maintenance Facility, a Paint Facility, and a Storage Facility. The effort aims to demonstrate time and cost savings and innovation in facility modernization. Optional R&M projects and equipment purchases may also be exercised. The Project Labor Agreement (PLA) language has been officially removed from the RPP.

Contract Details

  • Contract Type: Other Transaction Authority (OTA) agreement (10 U.S.C. 2808a). Firm-Fixed-Price (FFP) is contemplated for design services, construction management, overhead, and profit.
  • Period of Performance: Not to exceed 60 months.
  • Funding: Approximately $660 million for MILCON projects, with additional optional funding of $230 million for equipment and $85 million for R&M projects.
  • Award Type: A single award is intended, but multiple awards are possible if no single offeror can fulfill the entire scope.
  • Place of Performance: Anniston, Alabama.
  • Set-Aside: None specified.

Key Requirements & Deliverables

Offerors must propose designs that are code-compliant, meet approved final design criteria, and incorporate industrial process layout and planned production flow. Designs must adhere to Unified Facilities Criteria (UFC) and Anti-Terrorism/Force Protection (AT/FP) requirements, and be executed in a 3D BIM environment. Key personnel with extensive experience are required for Project Superintendent, D-B Project Manager, Construction QC Manager, Site Safety & Health Officer (SSHO), and Design QC Manager. The successful awardee must be self-certified CMMC Level 2 by September 30, 2026. Contractors will be responsible for all environmental permits, with government assistance. Bonding can be on each project rather than one overall agreement bond.

Submission & Evaluation

Proposals will be evaluated based on an integrated assessment of the Management Plan, Milestone Schedule, Added Value, and Price. Technical capability, design approach, and efficiency of design and management pricing are key. Past Performance is not an OTA evaluation criterion. Resilient design and energy conservation measures are viewed favorably. Technical Volume (PDF, max 60 pages) and Price Volume (Excel file) must be submitted. Late submissions will not be accepted.

Important Dates & Contacts

  • Industry Questions Due: June 15, 2026, at 06:00 AM EDT. Submit via email to usarmy.jbsa.acc-micc.mbx.tsc-div1@army.mil using the attached worksheet.
  • Project Proposals Due: June 29, 2026, at 07:00 AM CDT.
  • Site Visit: June 10, 2026, at Anniston Army Depot. Registration was due by June 4, 2026, at 12:00 PM EDT.
  • Primary Points of Contact: Jennifer Hastedt (Agreements Officer), Winston Franks, Lori Swade, and Jessica Ecker (Agreements Specialists). Email: usarmy.jbsa.acc-micc.mbx.tsc-div1@army.mil.

People

Points of Contact

MICC TSC Division 1 PLEASE EMAIL HERE FIRSTPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Special Notice
Posted: Jun 10, 2026
Anniston Army Depot FORGE II Other Transaction Authority (OTA) Request for Project Proposal (RPP) - W91QEY-26-R-A002 | GovScope