Argon Piping Supply, Installation and Testing

SOL #: 04012026Sources Sought

Overview

Buyer

Energy
Energy, Department Of
FERMILAB - DOE CONTRACTOR
Batavia, IL, 60510, United States

Place of Performance

Lead, SD

NAICS

No NAICS code specified

PSC

No PSC code specified

Set Aside

No set aside specified

Timeline

1
Posted
Apr 1, 2026
2
Response Deadline
Apr 30, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Energy (DOE), through FERMILAB - DOE CONTRACTOR, has issued a Sources Sought notice for Argon Piping Supply, Installation and Testing for the DUNE experiment in Lead, SD. This effort involves the supply, installation, and testing of a stainless-steel pipeline to transport gaseous Argon underground. Responses are due April 30, 2026.

Scope of Work

This opportunity seeks capabilities for the supply, installation, and testing of a stainless-steel pipeline. The pipeline is critical for the DUNE experiment, facilitating the transport of approximately 40,000 metric tons of Argon from the surface to the Central Utility Cavern (CUC) at the 4850 Level. Liquid Argon will be received at the Ross Shaft Argon Receiving station, stored, converted to gaseous phase, and then transported. The pipeline will consist of:

  • 8-inch diameter Schedule 10 pipe between the Argon Receiving Facility and the Ross shaft.
  • 6-inch diameter Schedule 10 pipe from the Ross shaft collar to the 4850 Level.
  • Return to 8-inch diameter Schedule 10 pipe from the Ross shaft to the CUC.

Contract & Timeline

  • Type: Sources Sought / Market Research
  • Set-Aside: None specified
  • Response Due: April 30, 2026, 8:00 PM EDT
  • Published: April 1, 2026, 9:19 PM EDT
  • Place of Performance: Lead, SD, United States

Evaluation

Responses to this Sources Sought notice will be used for market research purposes to inform future acquisition strategies and determine industry capabilities for this specialized piping project.

Additional Notes

This is a pre-solicitation notice for planning purposes only and does not constitute a request for proposal or commitment by the Government to award a contract.

People

Points of Contact

Jerry KingPRIMARY

Files

Files

Download

Versions

Version 1Viewing
Sources Sought
Posted: Apr 1, 2026