Arizona Forest Engineering and Road Maintenance (FERM)

SOL #: 12363N23Q4021Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, STEWARDSHIP CONTRACTING BRANCH
Washington, DC, 202501138, United States

Place of Performance

AZ

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Dec 9, 2022
2
Last Updated
Jan 15, 2026
3
Submission Deadline
Jan 10, 2023, 12:30 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

PROJECT DESCRIPTION: Arizona Forest Engineering and Road Maintenance (FERM) Blanket Purchase Agreement

Typical Service Activities

Road Maintenance service types of work will consist of routine work necessary to maintain the National Forest Road System in a functioning condition, providing safe public access and protecting the transportation facility investment and adjacent environmental resources.

Work is generally confined to within the limits of the existing traveled way and adjacent ditches, shoulders and cut/fill slopes. Work may also take place under or adjacent to the traveled way for resource protection, road stabilization, or to maintain traffic flow.

Potential Performance Activities: Sign Maintenance; Work Area Management (traffic control); Bridge maintenance; Surface Maintenance (Blading, Compaction, Watering); Drainage Maintenance (Slide & Slough Removal, Ditch Cleaning, Culvert Inlet/Outlet Cleaning, Cross-drain installation and maintenance, Ditch and Catch Basin Buttressing), Shoulder maintenance, Fill slope Armoring, Hazard Removal (Danger Tree Falling, Rock Fall and Debris Removal, etc.); Vegetation Management (seeding, brushing requirements); Bridge, guardrail, and Cattle guard Maintenance; Road Closure Device Maintenance or Construction, Rock Crushing and Stockpiling; Placement of Spot Rock; Dust Abatement; Minor Flood Repair and Water Diversion, and Road Demolition. Burned Area Emergency Response (BAER), Fire Suppression Rehabilitation, and Stream Restoration. Other complex systems may be within the scope to support road maintenance and restoration activities. Log out and mobilization costs are incidental to ordered work unless otherwise specified in the call order. This also includes trailheads, campgrounds, and other facility related roadwork.

Typical Construction Activities

Road construction types of work will consist of all construction activities normally associated with new road construction or reconstruction, but will be limited in scale, size, and complexity.

Work is generally confined to within the limits of the existing traveled way and adjacent ditches, shoulders and cut/fill slopes, or under the road prism for stream crossing improvements or road stabilization.

Possible Performance Activities: Surveying/Staking of Work Activities, signing (traffic control and new sign installation); Clearing; Earthwork and realignment; Drainage (surface, subsurface, drain dips, corrugated metal pipe, under drains, etc.); Aquatic Passage Work activities (small bridges or prefabricated structures, etc.); Aggregate Placement (base, surface, pit-run, riprap, etc.); Erosion Control (some erosion control such as seeding may be a service work activity; Shoulder, cut and fill slope reconstruction; Asphalt Placement, Asphalt Restoration (grinding, overlays, pothole patching, skin patching, crack sealing, chip sealing (some activities may be service work activity for supply/install), etc.); Cut/Fill Slope Stabilization; Aquatic Passage Construction; Cattle guard Installation; Installing Closure Devices (gates, earthen barriers, guardrails, etc.); Fence and Gate construction. Burned Area Emergency Response (BAER), Fire Suppression Rehabilitation, Stream Restoration, and specialty projects may also be included, such as recreation facility enhancements (campground road/trail work, toilet installation, parking lot and boat launch repairs, etc.). Other complex systems may be within the scope to support road maintenance and restoration activities. Emergency road repairs may require snowplowing for access, but in general, snowplowing is not part of this contract. Log out and mobilization costs are incidental to ordered work unless otherwise specified in the call order. This also includes trailheads, campgrounds, and other facility related roadwork.

PROJECT LOCATION: Projects shall covers the state of Arizona including the following forests; Apache-Sitgreaves, Coconino, Coronado, Kaibab, Prescott, and Tonto. The terrain varies and can have moderate hills on some areas and steep grades in others. Soil conditions vary as well, from soft and sandy to compacted and rocky. A general vicinity map will be included with all call orders. Maps will also be available to assist in locating the individual roads and are available for purchase. 

Contractors shall furnish all labor, supervision, equipment, materials, transportation, supplies (unless specified elsewhere as Government-furnished), and incidentals required to accomplish specified work in compliance with the terms, specifications, and provisions of the contract. Work is estimated to begin around January 15, 2023. Engineering point of contact is Armando De La Cruz, telephone: (505) 842-3859. NAICS 237310 with size standard $39.5 mil. This project is set aside 100% for small business.

People

Points of Contact

Catherine WhittedPRIMARY
Bryce KamerdulaSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 8
Solicitation
Posted: Jan 15, 2026
View
Version 7
Solicitation
Posted: Apr 11, 2025
View
Version 6
Solicitation
Posted: Mar 7, 2025
View
Version 5
Solicitation
Posted: Oct 20, 2023
View
Version 4
Solicitation
Posted: Oct 20, 2023
View
Version 3Viewing
Solicitation
Posted: Feb 13, 2023
Version 2
Solicitation
Posted: Jan 4, 2023
View
Version 1
Solicitation
Posted: Dec 9, 2022
View
Arizona Forest Engineering and Road Maintenance (FERM) | GovScope