ASH CREEK PIPELINE

SOL #: 140L3626Q0012Solicitation

Overview

Buyer

Interior
Bureau Of Land Management
MONTANA STATE OFFICE
BILLINGS, MT, 59101, United States

Place of Performance

Place of performance not available

NAICS

All Other Specialty Trade Contractors (238990)

PSC

Construction Of Other Non Building Facilities (Y1PZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 25, 2026
2
Submission Deadline
Apr 15, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Interior, Bureau of Land Management (BLM), Montana State Office is soliciting quotes for the ASH CREEK PIPELINE construction project. This project involves installing an 11,380-foot stock water pipeline with four hydrants and integrating a storage tank in Prairie County, Montana. This is a Total Small Business Set-Aside opportunity.

Scope of Work

The contractor will be responsible for furnishing all labor, equipment, supplies, and materials necessary to:

  • Install an 11,380-foot stock water pipeline.
  • Install four hydrants.
  • Integrate a storage tank (BLM-provided).
  • Connect the new pipeline to an existing water well and the BLM-provided storage tank.
  • Perform site work including trenching, plowing, backfilling, compacting, and reclamation.

Contract Details & Timeline

  • Contract Type: Firm Fixed Priced (FFP), Single Award Contract.
  • Type of Construction: Heavy.
  • NAICS Code: 238990, All Other Specialty Trade Contractors.
  • Magnitude: Between $25,000 and $100,000.
  • Set-Aside: Total Small Business Set-Aside.
  • Period of Performance: July 15, 2026, to December 1, 2026.
  • Questions Due: April 13, 2026, at 1:00 pm Mountain Time.
  • Quote Response Date: April 15, 2026, at 7:00 pm UTC.
  • Submission Method: Electronic submission to jorge_alvarez@ios.doi.gov.

Evaluation Criteria

Award will be made to the responsible firm whose quote is most advantageous to the Government. Prior Demonstrated Experience is significantly more important than cost or price.

Key Attachments & Notes

  • Site Visit: Strongly urged. An organized site visit is scheduled for April 8, 2026, at 10:00 AM Mountain Time at the Fallon Post Office, Fallon, MT.
  • Wage Determination: Document MT20260076 (published 01/02/2026) details prevailing wage rates for heavy construction in specified Montana counties, including Prairie County. Bidders must use these rates.
  • Specifications: Detailed technical requirements for general construction, site work (trenching, plowing, backfilling, compacting), water systems (PVC/HDPE pipe, hydrants), and reclamation.
  • Drawings: Visual layouts, plan and profile views for the mainline and Spur A, and details for the 20,000-gallon fiberglass storage tank and pipeline appurtenances.
  • Storage Tank Shop Drawings: Specific details for the Montana Fiberglass 12' diameter x 26' length underground storage tank (20,304 gallons).
  • All correspondence must be directed to the Contract Specialist, Jorge Alvarez.

People

Points of Contact

Alvarez, JorgePRIMARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 1Viewing
Solicitation
Posted: Mar 25, 2026
ASH CREEK PIPELINE | GovScope