ASM Air Compressor
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force is soliciting proposals for the procurement and installation of two Atlas Copco GA37VSD AP Air Compressors at Grand Forks AFB, ND. This is a Total Small Business Set-Aside combined synopsis/solicitation. The project includes removal of existing equipment, installation of new units, and training. Proposals are due by 2:00 PM CDT on February 13, 2026.
Scope of Work
The contractor shall provide all management, tools, supplies, equipment, and labor for the procurement and installation of two (2) new Atlas Copco Model GA37VSD AP Variable Speed Air Compressors in Room 118, Building 622, Grand Forks AFB, ND. Key requirements include:
- Procurement: Two Atlas Copco GA37VSD AP Variable Speed Air Compressors (50 HP, 460/3 Ph/60 Hz, 27.7-244.9 CFM at 175 PSI, IE5 Efficiency motor, low noise, remote monitoring, integrated water separator, compact footprint, 10-year warranty, cold weather protection).
- Site Visit: Mandatory site visit to Building 622 within 10 days of contract award.
- Removal & Disposal: Remove and dispose of the existing Sullivan Palatek 100UDG air compressor off-site.
- Installation: Install new air compressors, including hardware, piping, electrical connections, ductwork, and proper grounding.
- Training: Provide training to government personnel on operation and maintenance.
- Site Preparation: Provide construction support equipment (barriers, scaffolding, traffic control).
- Performance Standards: Installation must meet federal, state, and local regulations. Initial start-up by a certified Atlas Copco technician within 90 days for warranty qualification.
Contract Details
- Contract Type: Combined Synopsis/Solicitation for commercial items.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- NAICS Code: 333912 (Compressors And Vacuum Pumps) with a 1000-employee size standard.
- Place of Performance: Room 118, Building 622, Grand Forks AFB, ND.
- Delivery: No later than 90 days from the date of award.
- Quote Validity: Quotes must be valid through October 1, 2026.
Submission & Evaluation
- Proposal Due Date: February 13, 2026, by 2:00 PM Central Daylight Time.
- Submission Method: Quotes shall be sent via e-mail to the contracting points of contact.
- Content: Include Contractor's Unit and Total Price for each CLIN, discount for prompt payment, company point of contact, and photo/schematics/samples. Offers shall not exceed 10 pages.
- Evaluation Factors: Total Evaluated Price (price analysis for reasonableness) and Technical Acceptability (pass/fail based on Salient Characteristics).
- Award: Best-Value for the Air Force based on technical acceptability and fair and reasonable price.
- Eligibility: Offerors must be actively registered in SAM and enrolled in WAWF for invoicing/payment.
Special Requirements & Clarifications
- Base Access: Contractor employees must comply with base entry procedures, including potential background checks and annual Level 1 Antiterrorism Training. A Large Volume Issuance Request (LVIR) is required for contracts with over 10 employees.
- Utilities: Government will supply electrical, potable water, restroom, and phone utilities.
- Permits: Contractor is responsible for securing necessary permits and paying applicable taxes.
- Space Constraints: Compressors must fit within an 11ft x 12ft area; any additional space needed must be communicated.
- Existing Conditions: A forklift is available, but a pallet jack may be needed for final placement. The installation room is indoors without heating, necessitating the specified cold weather package. Existing equipment includes a refrigerant air dryer, a large air receiver tank, and an inline oil/water separator. There is no incumbent for this contract.
Amendment Details
Amendment 0001 updated the Statement of Work to the version dated January 30, 2026, and added Questions & Answers as Attachment 3. Offerors must acknowledge receipt of this amendment.