ASSEMBLY, CA6 WIRE
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically NAVSUP WEAPON SYSTEMS SUPPORT MECH, is soliciting proposals for the manufacture and supply of ASSEMBLY, CA6 WIRE. This opportunity requires adherence to specific design, material, and quality standards for this critical component. Proposals are due by March 23, 2026, at 8:30 PM Eastern Time.
Scope of Work
This solicitation is for the manufacture and design of ASSEMBLY, CA6 WIRE, which must meet the requirements specified in the ordering data and throughout the contract. Key design and material specifications include:
- Manufacturer: L3HARRIS MARITIME POWER & ENERGY SOLUTIONS, INC (CAGE 04801).
- Part Number: 900-76004.
- Exclusion of Mercury: Hardware or supplies must not intentionally contain or come into direct contact with mercury or mercury-containing compounds.
- Technical Documentation: Compliance with NAVSUP WSS-MECH CODE N94 additional technical documentation is required. In case of document conflicts, amendments to the purchase order/contract take precedence, followed by the schedule of supplies, terms and conditions, IRPOD/Master Procurement Specification, invoked STRs, drawings, and specifications.
- Vendor Waivers/Deviations: Requests for delivery date extensions or non-conformance waivers must be justified with an explanation of the cause, an offer of consideration, and an evaluation demonstrating no impact on quality, form, fit, or function.
Quality Assurance
Contractors must establish and maintain an inspection system acceptable to the Government. Records of all inspection work must be kept complete and available.
Packaging
Packaging requirements adhere to MIL-PRF-23199, particularly concerning the use of MIL-DTL-24466 green poly bags for items subject to cleanliness controls (e.g., MIL-STD-767, MIL-STD-2041, Refueling Clean, Reactor Plant Clean). Fire retardant packaging is no longer required, and MIL-STD 2073 packaging applies as specified elsewhere in the schedule.
Contract & Timeline
- Type: Solicitation
- Set-Aside: None specified
- Proposal Due: March 23, 2026, 8:30 PM ET
- Published: February 23, 2026
Additional Notes
Pricing for quotations is valid for 60 days after the closing date. Detailed instructions for DD Form 1423 data item requirements are provided, including definitions for various blocks (e.g., distribution statements, submission frequencies, and pricing groups). A Certificate of Compliance (DI-MISC-81356) is required at the time of material delivery.