ASSY, POWER CONTROL

SOL #: N0010425QLE01Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVSUP WEAPON SYSTEMS SUPPORT MECH
MECHANICSBURG, PA, 17050-0788, United States

Place of Performance

Place of performance not available

NAICS

Motor and Generator Manufacturing (335312)

PSC

Electrical Control Equipment (6110)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 11, 2026
2
Submission Deadline
Apr 10, 2026, 8:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy / NAVSUP Weapon Systems Support Mech is soliciting quotations for the repair of ASSY, POWER CONTROL (Electrical Control Equipment). This is an amendment to Solicitation N00104-25-Q-LE01, updating the quantity, repair turnaround time, and extending the quotation deadline. Only authorized distributors of the original manufacturer's item will be considered.

Scope of Work

This Request for Quotation (RFQ) is for the repair of ASSY, POWER CONTROL, identified by CAGE 16331, Ref. No. 63E920529G1. The repair work must meet operational and functional requirements, adhering to the contractor's standard practices, manuals, drawings, and technical orders. Marking shall be in accordance with MIL-STD-130, REV N.

Contract & Timeline

  • Type: Solicitation (RFQ for repair, resultant award will be bilateral)
  • Set-Aside: None
  • Response Due: April 10, 2026, 8:30 PM EDT
  • Published: March 11, 2026

Key Requirements & Evaluation

Offerors must provide a quotation for 8 EA (updated from 7 EA) and propose a Repair Turnaround Time (RTAT), with a government-requested RTAT of 90 days. Quotes must include unit price, total price, and RTAT. If the proposed RTAT exceeds 90 days, capacity constraints must be explained. Government Source Inspection (GSI) is required. Freight is FOB Origin, handled by Navy CAV or Proxy CAV.

A price reduction will be incurred for failure to meet the required RTAT due to unexcusable contractor delay; offerors must propose a price reduction amount per unit per month, up to a maximum. Quotes should also include T&E fees for Beyond Repair (BR/BER) assets and new unit pricing for comparison. Crucially, only authorized distributors of the original manufacturer will be considered, and proof of authorization on company letterhead is required with the offer.

Additional Notes

The solicitation includes detailed instructions for quality assurance, packaging (MIL-STD 2073), and obtaining document references. Information regarding changes in design, material, servicing, or part number must follow specific coding. The solicitation POC has been updated to Ashley H. Betlock.

People

Points of Contact

ASHLEY.H.BETLOCK.CIV@US.NAVY.MILPRIMARY

Files

Files

View
View
View

Versions

Version 1Viewing
Solicitation
Posted: Mar 11, 2026
ASSY, POWER CONTROL | GovScope