Astrodyne Fuel Cell Testing Load Bank

SOL #: 80NSSC26932066QCombined Synopsis/SolicitationSole Source

Overview

Buyer

National Aeronautics And Space Administration
National Aeronautics And Space Administration
NASA SHARED SERVICES CENTER
STENNIS SPACE CENTER, MS, 39529, United States

Place of Performance

Place of performance not available

NAICS

Other Computer Related Services (541519)

PSC

No PSC code specified

Set Aside

No set aside specified

Timeline

1
Posted
May 15, 2026
2
Submission Deadline
May 19, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Aeronautics And Space Administration (NASA), specifically the NASA SHARED SERVICES CENTER, is seeking to acquire Astrodyne Fuel Cell Testing Load Banks through a Brand Name requirement. This is a Combined Synopsis/Solicitation for a sole-source procurement of three Astrodyne TDI Model XBL-400-1K-12K-LM-LF units for the NASA Glenn Research Center. Quotes are due by May 19, 2026, at 4:00 PM ET.

Scope of Work

NASA Glenn Research Center requires three (3) Astrodyne TDI Model XBL-400-1K-12K-LM-LF water-cooled programmable DC load banks. These units must have specific characteristics: 0-400V, 0-1000A, 0-12KW, be water-cooled, and capable of Master/Slave programmable DC load operation. The primary objective is to ensure compatibility with existing fuel cell stacks and infrastructure at the facility.

Justification for Sole Source

The acquisition is justified as a sole-source procurement from Astrodyne Corporation due to the impracticality of competition. Existing fuel cell test facilities at NASA utilize Astrodyne TDI load banks, which are proven reliable. Standardizing on Astrodyne TDI ensures seamless integration as drop-in replacements, eliminates the need for additional personnel training or system modifications, and avoids significant reprogramming and integration costs/risks associated with alternate vendors. Using an alternative would lead to additional costs, compatibility issues with current control systems (RS232, PLC interfaces), and schedule delays.

Contract & Timeline

  • Opportunity Type: Combined Synopsis/Solicitation (Brand Name Sole Source)
  • Set-Aside: Not Applicable (Sole Source)
  • Place of Performance: NASA Glenn Research Center, 21000 Brookpark Road, Cleveland, OH 44135
  • Lead Time for Delivery: 20 weeks
  • Quote Due: May 19, 2026, 4:00 PM ET
  • Published: May 15, 2026

Submission Requirements

Vendors interested in submitting a quote must include the following information:

  • CAGE/UEI CODE
  • FOB DESTINATION
  • LEADTIME FOR DELIVERY
  • POC NAME & EMAIL

VENDORS MUST REFERENCE THE RFQ NOTICE ID NUMBER (435c4867760540378707762eac7d9d25) IN THE SUBJECT LINE OF YOUR EMAIL WHEN SUBMITTING A QUOTE.

Contact Information

People

Points of Contact

Monica WilsonPRIMARY

Files

Files

Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: May 15, 2026
Astrodyne Fuel Cell Testing Load Bank | GovScope