ATLANTIC UNDERSEA TEST AND EVALUATION CENTER (AUTEC) WATER TANKS REPLACEMENT, ALANTIC UNDERSEA TEST AND EVALUATION CENTER (AUTEC), ANDROS ISLAND, BAHAMAS

SOL #: N6945026R0006Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM SOUTHEAST
NAS JACKSONVILLE, FL, 32212-0030, United States

Place of Performance

Place of performance not available

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Repair Or Alteration Of Water Supply Facilities (Z2NE)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 9, 2026
2
Last Updated
Mar 12, 2026
3
Submission Deadline
Mar 25, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NAVFACSYSCOM SOUTHEAST, is soliciting proposals for a Firm-Fixed-Price (FFP) Design-Bid-Build (DBB) construction contract to replace a portion of the potable and fire supply water system at the Atlantic Undersea Test and Evaluation Center (AUTEC) on Andros Island, Bahamas. This project aims to restore the system to its original design intent while updating it for current use characteristics. Proposals are due March 25, 2026, by 2:00 PM Eastern Time.

Scope of Work

The project involves the replacement of two existing finished water holding/contact tanks (each 500,000 gallons capacity) that have reached the end of their useful life. It also includes the construction of one (1) elevated storage tank (150,000 gallons capacity) and the installation of new interconnecting potable water distribution piping (C900 PVC, 8" diameter or greater). The scope also requires the demolition of the two existing finished water tanks and abandoned piping. Detailed drawings (Conformed Set) provide the technical basis for understanding the full scope, including site layout, utilities, and structural details.

Contract Details & Timeline

  • Contract Type: Firm-Fixed-Price (FFP), Design-Bid-Build (DBB)
  • Period of Performance: 365 calendar days from the date of award.
  • Project Magnitude: Estimated between $10,000,000 and $25,000,000.
  • Set-Aside: This procurement is solicited on an unrestricted basis, inviting full and open competition.
  • NAICS Code: 237110 (Water and Sewer Line and Related Structures Construction), with a size standard of $45,000,000.
  • Proposal Due Date: March 25, 2026, by 2:00 PM Eastern Time.
  • Published Date: February 24, 2026.
  • Site Visit: A site visit is scheduled for March 10, 2026. A Site Visit Map (Attachment G) is provided.
  • Pre-Proposal Inquiries (PPIs): Due ten (10) calendar days prior to the closing date, submitted via the ProjNet system (Attachment D provides instructions).

Evaluation Factors

Award will be based on a best value determination, considering price and the following non-price factors:

  • Factor 1: Experience (Construction Experience) – Demonstrated via Attachment A (Construction Experience Project Data Sheet).
  • Factor 2: Past Performance – Documented using Attachment B (NAVFAC/USACE Past Performance Questionnaire Form PPQ-0).
  • Factor 3: Safety – Assessed through Attachment C (Safety Data Sheet, including DART/TCR rates and a safety narrative).
  • Factor 4: Technical Approach Non-price factors (Experience, Safety, Technical Approach) are of equal importance and combined are equal in importance to Past Performance. The combined non-price factors are approximately equal to price.

Key Submission Requirements

Offerors must be registered in the System for Award Management (SAM). Performance and Payment Bonds are required. Personnel requiring access to AUTEC/Andros for contract performance must follow specific travel arrangement procedures outlined in Attachment F.

Contact Information

People

Points of Contact

Delcheia TurnerPRIMARY
Sheila BorgesSECONDARY

Files

Files

No files attached to this opportunity

Versions

Version 3
Solicitation
Posted: Mar 12, 2026
View
Version 2Viewing
Solicitation
Posted: Feb 24, 2026
Version 1
Pre-Solicitation
Posted: Feb 9, 2026
View