Please see attachment for details on AM0007.
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
AVIATION FUEL STORAGE FACILITY AT SOTO CANO AIR BASE, HONDURAS. The project is for a new fuel storage facility that will provide a minimum of 300,000 gallons of fuel storage. Three nominally 100,000-gallon factory fabricated storage tanks will be provided to meet this requirement. The three storage tanks will be placed on a curbed foundation slab for containment of small drips and spills. The system will be provided with two (2) commercial truck offload skids to provide system redundancy as well as an increased rate of fuel receipt. Each of the commercial offload skids will be capable of offloading at a rate of 600 GPM. The new fuel system will have two (2) truck fillstands, each capable of issuing fuel at a rate of 600 GPM. The new system will require a POL Ops building equipped with a fuel laboratory meeting C++ sizing requirement as outlined in UFC 4- 310-03.