AZ FLAP PIM FR510(1) Sabino Canyon Park

SOL #: 6982AF25B000006Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
6982AF CENTRAL FEDERAL LANDS DIVISI
LAKEWOOD, CO, 80228, United States

Place of Performance

Mount Lemmon, AZ

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jul 15, 2025
2
Last Updated
Sep 5, 2025
3
Submission Deadline
Aug 26, 2025, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

TOTAL SMALL BUSINESS SET-SIDE

This project includes the construction of a new paved parking lot consisting of approximately 75 parking spaces, a kiosk for Arizona Trail information, a public restroom, and the improvement of Sabino Canyon Park Road to accommodate approximately 21 new on-street parking spaces, an asphalt surface rehabilitation for approximately half a mile, and the installation of a 5-foot-wide pathway as part of the Arizona Trail. The project improvements will provide a new paved surface, roadway excavation, retaining wall construction, tree clearing, ditch construction/reconditioning to improve drainage, installation of culverts, a new public bathroom, and the installation of new street signage and pavement marking.

PRINCIPAL WORK ITEMS:

20401-0000 Roadway Excavation: 7,000 CUYD

25902-0000 Soil Nail Retaining Wall: 8,200 SQFT

30202-2000 Roadway Aggregate, Method 2: 1,800 TON

40301-0100 Asphalt Concrete Pavement, Type 1: 1,800 TON

60202-0600 36-Inch Equivalent Diameter Arch Pipe Culvert: 180 LNFT

60901-1700 Curb Concrete, 18-Inch Depth: 1,200 LNFT

60906-1000 Gutter, Concrete (Ditch): 750 SQYD

61501-0800 Sidewalk, Concrete: 1,100 SQYD

63501-0000 Temporary Traffic Control: LPSM

64603-1000 Fixture, Vault Toilet: 2 EACH

ANTICIPATED SCHEDULE: 

Advertisement – July 2025

Award – September 2025

NTP – September 2025

Contract Completion – May 2026

The estimated price range of the project work is between $5 million and $10 million.

People

Points of Contact

Eric GrosskreuzPRIMARY
Kelly PalmerSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 10Viewing
Solicitation
Posted: Sep 5, 2025
Version 9
Solicitation
Posted: Aug 26, 2025
View
Version 8
Solicitation
Posted: Aug 22, 2025
View
Version 7
Solicitation
Posted: Aug 20, 2025
View
Version 6
Solicitation
Posted: Aug 18, 2025
View
Version 5
Solicitation
Posted: Aug 18, 2025
View
Version 4
Solicitation
Posted: Aug 13, 2025
View
Version 3
Solicitation
Posted: Aug 12, 2025
View
Version 2
Solicitation
Posted: Aug 7, 2025
View
Version 1
Solicitation
Posted: Jul 15, 2025
View
AZ FLAP PIM FR510(1) Sabino Canyon Park | GovScope