AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT

SOL #: 6982AF25B000019Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
6982AF CENTRAL FEDERAL LANDS DIVISI
LAKEWOOD, CO, 80228, United States

Place of Performance

Payson, AZ

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

No set aside specified

Timeline

1
Posted
Jan 20, 2026
2
Submission Deadline
Nov 19, 2025, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

PROJECT NUMBER: AZ FS 289(1)

PROJECT NAME: AZ NFSR 289 BRIDGE REPLACEMENT

PROJECT DESCRIPTION:  The project is located in the Tonto National Forest approximately 18 miles East of Payson, AZ. The existing Tonto Creek Bridge (no. 031204000003356) was built in 1956 and is a single lane, concrete slab bridge. NFSR 289 is a two-lane roadway that accesses several residential homes, a fish hatchery, and a summer camp along with many recreational sites and trailheads. The purpose of this project is to replace the existing Tonto Creek Bridge, expand the Horton Springs Parking Lot and improve pedestrian and vehicular safety and access to the recreation sites around the Tonto Creek Bridge on NFSR 289.

SCOPE OF THE WORK:  The scope of the project includes reconstructing a portion of FR 289, removing the existing bridge and constructing a new single-span bridge over Tonto Creek including new sidewalk and reconstruction of the Horton Springs Parking Lot.  This project includes removal of the existing two-span bridge, including removal of the existing pier.  The project also includes channel grading in Tonto Creek.  The new roadway and bridge will be constructed East of the existing alignment (upstream of the existing bridge) to minimize impacts to public traffic.

PRINCIPAL WORK ITEMS:

  • 20304-2000 Removal of Bridge:  1 LPSM
  • 20401-0000 Roadway Excavation: 3,100 CUYD
  • 20401-0000 Roadway Excavation (Channel Excavation): 500 CUYD
  • 20441-0000 Waste: 2,300 SQFT
  • 30202-2000 Roadway Aggregate, Method 2: 750 TON
  • 40301-0100 Asphalt Concrete Pavement, Type 1: 535 TON
  • 50101-2600 Minor Concrete Pavement, Plain, 6-Inch Depth, 180 SQYD
  • 55201-0200 Structural Concrete, Class A (AE): 252 CUYD
  • 55302-1100 Precast, Prestressed Concrete Box Beam, Type B2-48: 448 LNFT
  • 55401-1000 Reinforcing Steel: 14,200 LB
  • 55401-2000 Reinforcing Steel, Epoxy-Coated: 18,500 LB
  • 55601-0900 Bridge Railing, Steel:  162 LNFT
  • 62801-000 Temporary Stream Diversion:  LPSM

ANTICIPATED SCHEDULE: 

Advertisement – October 2025

Award – December 2025

NTP – January 2026

Contract Completion – October 2026

Due to weather, no onsite work is anticipated between January and April 2026

ESTIMATED COST RANGE:  Total estimated cost between $2,000,000 and $5,000,000.

People

Points of Contact

Stephanie NavarroPRIMARY
Kelly PalmerSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Solicitation
Posted: Jan 20, 2026
AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT | GovScope