B-21 60 Row Environmental Protection Shelters - North
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Am-0002: The purpose of this amendment is to extend the proposal due date, update wage determinations, revise the DIV 00 22 00, update the specs/drawings, and provide the Industry Day slides/attendance roster // Am-0001: The purpose of this amendment is to update the wage determinations, revise the DIV 00 22 00, provide the site visit sign-in sheet, and revise the drawings/specifications. // This project will provide five (5) new pre-engineered metal Environmental Protection Shelters (EPS), approximately 20,000 SF each. EPS?s are sized to fit the B-2A ?Spirit? aircraft with space to perform general aircraft maintenance. The project also includes associated airfield and ground support equipment (GSE) paving. Supporting facilities include two maintenance kiosks, approximately 160 SF each, providing electrical and communication infrastructure to the EPS?s. This project will include a space or spaces constructed to AFI 16-1404 requirements.