B-21 60 Row South- Environmental Protection Shelters (EPS) at Ellsworth Air Force Base (AFB), South Dakota (SD)
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Defense, specifically the Department of the Army (W071 ENDIST OMAHA), has issued a Presolicitation for the construction of B-21 60 Row South- Environmental Protection Shelters (EPS) at Ellsworth Air Force Base (AFB), South Dakota (SD). This notice was updated on December 30, 2025, and indicates a future solicitation for this construction project. Responses are due by January 30, 2026.
Scope of Work
This opportunity falls under Product Service Code Y1BZ: Construction Of Other Airfield Structures. The project involves the construction of Environmental Protection Shelters (EPS) to support the B-21 aircraft program at Ellsworth AFB.
Contract & Timeline
- Type: Presolicitation
- Set-Aside: None specified
- Response Due: January 30, 2026, 5:00 PM ET
- Published: December 30, 2025
Evaluation
As a presolicitation, specific evaluation criteria are not yet detailed. This stage is for planning and market research purposes, preceding a formal solicitation.
Additional Notes
The notice includes references to the PIEE Solicitation Module, including links for the module itself, web-based training, and registration instructions. Interested parties should review these documents for future engagement with the solicitation process. The Department of Defense Procurement Toolbox is also referenced.