B-21 B7520 Battery Storage at Ellsworth AFB, SD
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
This project will construct a new single-story maintenance (MX) battery storage facility at Ellsworth AFB, SD. Structure will consist of strip footings, concrete or masonry walls, steel or concrete roof framing. Interior partitions will be concrete, masonry, and/or metal stud with gypsum board. Facility will include approximately 500-750 SF of lithium-ion battery storage and charging space. Building will be minimally occupied and will be specifically for battery storage. Installation of associated site features, paving, and utilities may be required.RETURN WITH OFFER: INFORMATION REQUIRED BY SECTION 00 10 00 (SF1442), SECTION 00 22 00, AND SECTION 00 45 00.THIS SOLICITATION IS A TOTAL SMALL BUSINESS SET-ASIDE.Contract Specialist: Sarah Martin, sarah.a.martin@usace.army.milContracting Officer: Brittany Gull, brittany.c.gull@usace.army.mil