B-52 Landing Gear Drag Link
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Defense Logistics Agency (DLA) Aviation at Ogden, UT has issued a Solicitation for the acquisition of 39 Tripod Links (NSN: 1620-00-620-7642, P/N: 5-36035-3) for the B-52 Aircraft Landing Gear. This opportunity is a 100% Total Small Business Set-Aside. While currently restricted to specific qualified sources, the solicitation includes a detailed process for new sources to achieve qualification. Proposals are due May 11, 2026, at 2:00 PM.
Scope of Work
This requirement is for the manufacturing and delivery of 39 Outboard Tripod Links, also known as B-52 Drag Links, Landing G. The item is made of Metal-Aluminum. Key technical requirements include Unique Identification (UID) marking per MIL-STD-130, serial number requirements, and adherence to Higher Level Contract Quality Requirements, specifically AS9100. An Engineering Data List (EDL) provides critical drawing numbers and component information.
Contract Details
This is a Firm Fixed Price acquisition. Bidders have two options: Bid A, which includes a First Article (FA) and 38 production articles, or Bid B, which assumes an FA waiver and covers 39 production articles. Delivery for the First Article is required within 365 calendar days, with production articles due within 14 months. Early and partial deliveries are acceptable.
Qualification & Eligibility
This acquisition is a 100% Total Small Business Set-Aside. The solicitation initially restricts participation to currently qualified sources: Machine Specialties (CAGE 1DDX0) and Arlington Precision Components (CAGE 1DDX0). However, the Manufacturing Qualification Requirements (MQR) document outlines a comprehensive process for potential offerers to become qualified. This involves submitting a Source Approval Request (SAR) package, demonstrating manufacturing and testing capabilities, verifying the Technical Data Package (TDP), and conducting qualification testing at an estimated cost of $2,600.00 over approximately 365 days. Waiver criteria for qualification are also detailed. Full qualification is required before contract award.
Submission & Evaluation
Proposals are due by May 11, 2026, at 2:00 PM. The primary evaluation factor is Price or Cost. Other factors will be combined and evaluated as a whole. A First Article Evaluation Cost of $2,000.00 is associated with Bid A. A Contract Data Requirements List (CDRL) specifies the submission of Test/Inspection Reports concurrently with the First Article.
Additional Notes
Packaging and marking requirements are stringent, adhering to MIL-STD-2073, MIL-STD-129, and ISPM No. 15 for wood packaging. The Wide Area Workflow (WAWF) system is required for payment requests and receiving reports. The point of contact for this opportunity is Justin Rogers (justin.rogers.28@us.af.mil).