B-52H Component Analysis

SOL #: FA810726B52HCASources Sought

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8107 AFLCMC WWK
TINKER AFB, OK, 73145-3303, United States

Place of Performance

S Coffeyville, OK

NAICS

Other Aircraft Parts and Auxiliary Equipment Manufacturing (336413)

PSC

Miscellaneous Aircraft Accessories And Components (1680)

Set Aside

No set aside specified

Timeline

1
Posted
Jan 16, 2026
2
Last Updated
Feb 23, 2026
3
Response Deadline
Mar 10, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force (AFLCMC WWK) is conducting a Sources Sought market research effort for B-52H Component Analysis. This initiative seeks qualified sources to perform in-depth technical assessments of Line Replaceable Units (LRUs) to enhance supportability, address material availability constraints, and mitigate obsolescence risks for the B-52H platform. The primary place of performance is S Coffeyville, OK. Responses are due by March 10, 2026.

Scope of Work

The government requires expertise in:

  • Performing in-depth technical assessments of specified B-52H LRUs (e.g., Constant Speed Drives, Generators, Regulators).
  • Developing solutions for material availability challenges, including Diminishing Manufacturing Sources (DMS).
  • Creating long-term sourcing strategies and data analysis based on engineering evaluations.
  • Addressing obsolete component issues, risks, and mitigation steps.
  • Developing a comprehensive Technical Report-Study documenting weapon system configuration, findings, and recommendations for obsolescence mitigation.
  • Conducting Qualification/Endurance testing (at least 1,500 hours, 25% in extreme temperatures) for Generator/CSD units, followed by teardown and failure analysis.
  • Providing failure analysis and corrective action recommendations for government-transferred failed units.
  • Recommending improvements to existing designs and redesign options.

Contract & Timeline

  • Type: Sources Sought / Market Research
  • Set-Aside: None specified; all businesses (large and small), joint ventures, and teaming arrangements are encouraged to participate. Specific questions regarding subcontracting opportunities for Small Business are requested.
  • Response Due: March 10, 2026, by close of business.
  • Published: February 23, 2026.

Evaluation

Submissions will be reviewed in accordance with FAR Part 19 procedures to identify potential sources and determine industry capabilities. This market research is for planning purposes only and does not guarantee future solicitation or contract awards.

Additional Notes

The government will not reimburse participants for any expenses incurred in responding to this synopsis. Interested parties should provide documentation supporting their company's capabilities and explain how any lack of experience in specific areas will be overcome (e.g., teaming, subcontracting). Questions should be directed to Jacob Booth at jacob.booth@us.af.mil.

People

Points of Contact

Thomas LangdonSECONDARY

Files

Files

Download
Download
Download

Versions

Version 4Viewing
Sources Sought
Posted: Feb 23, 2026
Version 3
Sources Sought
Posted: Jan 20, 2026
View
Version 2
Sources Sought
Posted: Jan 20, 2026
View
Version 1
Sources Sought
Posted: Jan 16, 2026
View
B-52H Component Analysis | GovScope