B-52J CERP Production Modification Kits & ICS

SOL #: FA810726RB001Pre-Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8107 AFLCMC WWK
TINKER AFB, OK, 73145-3303, United States

Place of Performance

S Coffeyville, OK

NAICS

Aircraft Manufacturing (336411)

PSC

Technical Representation Services: Aircraft And Airframe Structural Components (L015)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 2, 2026
2
Last Updated
May 12, 2026
3
Response Deadline
Jun 30, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is conducting a Presolicitation for the B-52J Commercial Engine Replacement Program (CERP) Production Modification Kits & Interim Contractor Support (ICS). This notice announces an Industry Days event and provides a draft solicitation for industry feedback. The program aims to award a supply contract for B-52 aircraft modernization kits.

Opportunity Details

This is a Presolicitation for the B-52J CERP. The acquisition team is hosting an Industry Days event on May 12-13, 2026 (0800 – 1700 CST) at Rose State College, Midwest City, OK. The event will provide an overview of technical requirements, solicitation details, and the anticipated acquisition schedule. It's an opportunity for industry to ask questions and provide feedback on the draft Statement of Work (SOW).

A draft solicitation (RFO 15.101(b)) has been posted for review. No proposals are being accepted at this time.

Scope of Work

The anticipated contract will involve building Production Modification Kits (Kit Group A, B, and E) for the B-52 aircraft modernization effort, along with Interim Contractor Support (ICS). This includes associated support, spares, support equipment, and data. Work may also involve updates to Technical Data Packages (TDP) and Bills of Materials (BOM). First Article Testing is required for Lot 1 Kit Groups. Specific tasks include Program/Manufacturing Management, Integrated Logistics Support, Field Service Representative (FSR) Support, Travel, Spare Parts, Peculiar Support Equipment, Production Tooling, Common Support Equipment, and Data.

Contract Details

  • Type: Indefinite Delivery/Indefinite Quantity (ID/IQ) Contract
  • Duration: Total contemplated performance period of 10 years (Base Period: Years 1-4, plus six Option Periods: Years 5-10).
  • NAICS: 336411 (Aircraft Manufacturing) with a Size Standard of 1500 Employees.
  • Quality Assurance: Requires compliance with AS9100 or ISO 9001:2015 standards.
  • Pricing: A draft pricing matrix (Att11-Appendix_D) is provided, detailing how to submit proposed pricing for various Contract Line Items (CLINs) and how the Total Evaluated Price (TEP) will be calculated.

Key Dates & Actions

  • Industry Day Registration Deadline: Monday, May 4, 2026. Registration is required via the provided link: https://forms.osi.apps.mil/r/WSPCBhLhPg. Attendance is limited to four representatives per company.
  • Industry Day Event: Tuesday, May 12 and Wednesday, May 13, 2026. One-on-one sessions with vendors are available upon request during registration.
  • Draft Solicitation Questions Deadline: NLT COB April 30, 2026. Submit questions via email to Ashley Brink (ashley.brink@us.af.mil), CC Kacie Cram (kacie.cram@us.af.mil).
  • Controlled Document Access: To access technical data, offerors must submit an approved DD Form 2345 and ensure their company is registered on the Joint Certification Program (JCP) website (https://www.dla.mil/Logistics-Operations/Services/JCP/). The DATA CUSTODIAN listed on DD Form 2345 Block 3 should then request access on SAM.gov.

Evaluation

Evaluation factors are detailed in Section M (Att13-Appendix_F) of the draft solicitation. Pricing information is in Section B and Appendix D (Att11).

Additional Notes

The draft solicitation mentions a HUBZone preference in Section L (52.219-4). Funds are not presently available for this effort; award is contingent upon fund availability. The Government reserves the right to cancel Industry Days up to 5 days prior. The anticipated response date for the future solicitation is June 30, 2026.

People

Points of Contact

Ashley A. BrinkPRIMARY
Kacie CramSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6
Pre-Solicitation
Posted: May 12, 2026
View
Version 5
Pre-Solicitation
Posted: May 7, 2026
View
Version 4
Pre-Solicitation
Posted: Apr 20, 2026
View
Version 3Viewing
Pre-Solicitation
Posted: Apr 16, 2026
Version 2
Pre-Solicitation
Posted: Apr 10, 2026
View
Version 1
Pre-Solicitation
Posted: Apr 2, 2026
View