B2449 Flooring & Wall Panel Removal & Replacement
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force is soliciting proposals for B2449 Flooring & Wall Panel Removal & Replacement at the Child Development Center (CDC), Building 2449, Shaw Air Force Base, SC. This Total Small Business Set-Aside opportunity seeks a contractor to perform a targeted interior renovation, replacing worn flooring and wall panels to improve aesthetics, functionality, and extend the facility's service life. The contract will be a Firm Fixed Price award. Offers are due by March 17, 2026, at 2:00 PM EST.
Scope of Work
The contractor shall provide all necessary personnel, equipment, supplies, and materials to execute a comprehensive interior renovation. Key tasks include:
- Flooring Replacement: Removal and replacement of worn carpet and vinyl flooring, including new cove base and floor transitions. This involves installing a shock-absorbing flooring system with carpet in classrooms, carpet tiles (without padding) in non-classroom areas/hallways/lobbies, and vinyl sheet flooring in specified areas, all adhering to a Southwest color scheme.
- Wall Panel Replacement: Removal and replacement of existing Reinforced Fiberglass Plastic (RFP) panels and associated trim in classrooms.
- Material Specifications: Strict adherence to detailed material specifications outlined in the "Southwest Finish Concept" document (Attach 03), covering paint, wall protection, rubber base, tile, upholstery, laminate, solid surface, and other interior finishes.
- Performance Standards: Compliance with specific standards for shock-absorbing flooring (e.g., CPSC, ASTM F 1292/2373 for 3-foot critical fall height), carpet (e.g., AF Carpet Standards ETL-07-4, CRI labeled, 100% branded nylon, integrated moisture barrier), RFP panels (e.g., 0.090" min, ASTM E-84 Class C fire rating, GREENGUARD Gold Certified), and low VOC, water-based acrylic adhesives.
Contract Details & Timeline
- Contract Type: Firm Fixed Price
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: 7220 (Floor Coverings)
- Period of Performance: 111 Calendar Days, structured in phases: 21 days for demolition, 45 days for a break (drywall/paint), and 45 days for flooring and RFP installation.
- Place of Performance: Child Development Center, Building 2449, Shaw Air Force Base, SC.
- Site Visit: March 9, 2026, at 9:00 AM EST (B2449 parking lot).
- Questions Due: March 11, 2026, at 2:00 PM EST.
- Offers Due: March 17, 2026, at 2:00 PM EST.
- Price Validity: Offers must be valid until March 31, 2026.
Submission & Evaluation
Offerors must email their proposals to SrA Tessa Steward at tessa.steward@us.af.mil. Evaluation will be based on Price and Technical Acceptability. Technical acceptability requires a detailed description and quantities for each line item as specified in the Pricing Worksheet (Attach 05).
Special Requirements
Bidders must comply with the Service Contract Act Wage Determination (No. 2015-4439, Rev. 28) for Sumter County, SC, covering minimum wage rates, fringe benefits, paid sick leave, vacation, and holidays. Other requirements include security protocols (background checks, base passes), adherence to safety standards (OSHA, DoD, LOTO), and understanding of environmental management systems. The Floor Plan (Attach 02) is essential for understanding the physical space.