B254 Mezzanine Repair at Pease ANGB

SOL #: W50S8A26QA008Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W7NN USPFO ACTIVITY NHANG 157
PORTSMOUTH, NH, 03801-2886, United States

Place of Performance

Newington, NH

NAICS

Structural Steel and Precast Concrete Contractors (238120)

PSC

Iron And Steel Primary And Semifinished Products (9640)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 23, 2026
2
Last Updated
May 29, 2026
3
Submission Deadline
May 22, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, NH Air National Guard, is seeking quotes for B254 Mezzanine Repair at Pease ANGB, Newington, NH. This is a 100% Total Small Business Set-Aside for structural steel and precast concrete contractors. The project involves installing C-channel steel beams to reinforce an existing equipment housekeeping slab. Quotes are due by 04:00 PM Eastern Time on May 22, 2026.

Scope of Work

This requirement, under CLIN 0001, involves providing and installing three (3) C-channel steel beams beneath an existing equipment housekeeping slab. These beams will be welded to existing Wide Flange beams as detailed in Attachment 1. The project aims to reinforce the mechanical mezzanine at Building 254, where the slab's design capacity was exceeded. Work must conform to AWS D1.1:2025 standards, with welded areas prepped and coated to match existing conditions. The government will clear equipment below the mezzanine and provide access via an adjacent roll-up door. The contractor is responsible for fabricating structural members and connections.

Contract Details

  • Solicitation Number: W50S8A26QA008 (Request for Quote - RFQ)
  • Contract Type: Firm-Fixed Price (FFP)
  • NAICS Code: 238120 Structural Steel and Precast Concrete Contractors (Small Business Size Standard: $19,000,000)
  • Set-Aside: 100% Total Small Business Set-Aside (FAR 19.5)
  • Place of Performance: 302 Newmarket Street, Newington, NH 03801
  • FOB: Destination

Key Dates & Actions

  • Site Visit: A site visit was held on May 12, 2026, at 09:00 AM at Pease ANGB. Attendees were required to submit names by 4:00 PM on May 8, 2026, and possess Real ID.
  • Questions Due: May 15, 2026, by 12:00 PM EST. Submit in writing via email to Casey Pridham (casey.a.pridham.mil@army.mil) and Matthew Lapointe (matthew.r.lapointe.civ@army.mil). The RFI period was extended to accommodate site visit questions.
  • Quotes Due: May 22, 2026, by 04:00 PM Eastern Time. Quotes must be valid for sixty (60) days.
  • SAM Registration: Required and must be "ACTIVE" at the time of award.
  • Post-Award Requirements: Contractor must obtain a hot work permit and submit base access/badging documentation within 10 days of contract award.

Evaluation & Clauses

Evaluation factors and instructions for submitting quotes are detailed in the "Provisions and Clauses" document (IAW FAR 52.212-1 and 52.212-2). Bidders must review the updated clauses and provisions, which include requirements related to safeguarding defense information, telecommunications equipment prohibitions, payment via Wide Area WorkFlow (WAWF), and the recently incorporated Clause 52.222-90 addressing DEI Discrimination by Federal Contractors. The contractor is responsible for providing an independent Certified Welding Inspector (CWI) for AWS D1.1 inspections.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 8
Combined Synopsis/Solicitation
Posted: May 29, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: May 22, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: May 21, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: May 20, 2026
View
Version 4Viewing
Combined Synopsis/Solicitation
Posted: May 8, 2026
Version 3
Combined Synopsis/Solicitation
Posted: May 5, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 29, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 23, 2026
View
B254 Mezzanine Repair at Pease ANGB | GovScope