B254 Mezzanine Repair at Pease ANGB

SOL #: W50S8A26QA008Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W7NN USPFO ACTIVITY NHANG 157
PORTSMOUTH, NH, 03801-2886, United States

Place of Performance

Newington, NH

NAICS

Structural Steel and Precast Concrete Contractors (238120)

PSC

Iron And Steel Primary And Semifinished Products (9640)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 23, 2026
2
Last Updated
May 29, 2026
3
Submission Deadline
May 29, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The NH Air National Guard is soliciting quotes for B254 Mezzanine Repair at Pease ANGB, Newington, NH. This is a Total Small Business Set-Aside for structural steel work. The project involves installing three C-channel steel beams to reinforce an equipment housekeeping slab. Quotes are due by May 29, 2026, at 04:00 PM Eastern Time.

Scope of Work

The requirement, under NAICS 238120 (Structural Steel and Precast Concrete Contractors), is to provide and install three (3) C-channel steel beams under an existing equipment housekeeping slab. These beams must be welded to existing Wide Flange beams as detailed in Attachment 1. The Statement of Work (SOW) specifies that this reinforces the mechanical mezzanine at Building 254, addressing an exceedance of the slab's design capacity. All work must conform to AWS D1.1:2025 standards, with welded areas prepped and coated to match existing conditions. The contractor is responsible for fabricating structural members and connections.

Contract & Timeline

  • Type: Request for Quote (RFQ), Firm-Fixed Price (FFP) contract
  • Set-Aside: Total Small Business
  • Solicitation Number: W50S8A26QA008
  • Quote Due: May 29, 2026, 04:00 PM ET
  • RFI Deadline: May 15, 2026, 12:00 noon EST (extended by Amendment #1)
  • Site Visit: May 12, 2026, 09:00 AM at Pease ANGB (RSVP by May 8, 2026, 4:00 PM ET)
  • Quotes Validity: Sixty (60) days
  • Published: May 20, 2026

Evaluation

Quotes will be evaluated as described in the "Provisions and Clauses" document (IAW FAR 52.212-2). Bidders must review these clauses to understand obligations, rights, and terms, including those related to payment, invoicing, and compliance. The Government intends to award a Firm-Fixed Price contract.

Key Requirements & Instructions

  • SAM Registration: Required to be "ACTIVE" at the time of award (www.sam.gov).
  • Base Access: Participants for the site visit MUST have a passport or Real ID-compliant identification. Contractors must submit documentation for base access and badging within 10 days of contract award.
  • Hot Work Permit: Contractor must obtain a hot work permit from the Pease Fire Department within 10 days of contract award.
  • Welding Inspection: Contractor must provide an independent Certified Welding Inspector (CWI) for AWS D1.1 inspections.
  • Questions: Submit all technical or contractual questions in writing via email to Casey Pridham (casey.a.pridham.mil@army.mil) and Matthew Lapointe (matthew.r.lapointe.civ@army.mil). Telephone inquiries will not be accepted.
  • Amendments: Amendment #1 scheduled a site visit and extended the RFI period. Amendment #2 incorporated Clause 52.222-90 (DEI Discrimination) and attached the Site Visit Sign-in Sheet.
  • Attachments: Critical documents include architectural drawings (Attachment 1), the Statement of Work, and Provisions and Clauses, which detail legal and regulatory requirements.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 8
Combined Synopsis/Solicitation
Posted: May 29, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: May 22, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: May 21, 2026
View
Version 5Viewing
Combined Synopsis/Solicitation
Posted: May 20, 2026
Version 4
Combined Synopsis/Solicitation
Posted: May 8, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: May 5, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 29, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 23, 2026
View