B300 Waterfront Machine Shop Roof and HVAC Repair Portsmouth Naval Shipyard
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically NAVFACSYSCOM MID-ATLANTIC, has issued a Solicitation for Roof and HVAC Repair services for Building 300 at Portsmouth Naval Shipyard. This project addresses critical infrastructure deficiencies, including a deteriorated roof and outdated HVAC systems containing hazardous materials. Responses are due by March 2, 2026.
Scope of Work
This project, categorized under Repair Or Alteration Of Miscellaneous Buildings (Z2JZ), involves comprehensive upgrades to Building 300. Key components include:
- Roof Replacement: Removal of the existing roof and installation of a new fully adhered 0.080 thermoplastic polyolefin (TPO) roof membrane assembly.
- HVAC System Overhaul: Removal of all air handling equipment, removal or abandonment-in-place of associated ductwork, and abatement of RCRA 8 dust and asbestos-containing materials. This includes replacing the existing steam to hot water plant, adding unit heaters, dedicated outdoor air systems, and destratification fans.
- Fire Safety Systems: Removal and replacement of the existing fire alarm, mass notification system, and fire sprinkler system serving industrial work areas.
- Electrical Infrastructure: Replacement of the existing 2500 kVA main service transformer, 15 kV service switch, and 480V main and feeder switchgear.
- Site Improvements: Utility construction and restoration of disturbed areas resulting from demolition activities, including electrical and fire safety systems.
Contract & Timeline
- Opportunity Type: Solicitation
- Set-Aside: None specified
- Response Due: March 2, 2026, 7:00 PM EST
- Published Date: January 28, 2026
Additional Notes
Interested parties should refer to the PIEE Solicitation Module for full details and submission instructions. The primary point of contact for this opportunity is Mary Pool at mary.pool@navy.mil or 757-341-1650.