B518 Generator Maintenance and Operations

SOL #: FA460026Q0035Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4600 55 CONS PKP
OFFUTT AFB, NE, 68113, United States

Place of Performance

St Columbans, NE

NAICS

Facilities Support Services (561210)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Special Industry Machinery (J036)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 4, 2026
2
Last Updated
May 12, 2026
3
Submission Deadline
May 18, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for B518 Generator Maintenance and Operations at Offutt Air Force Base, NE. This combined presolicitation/solicitation (RFQ) seeks a contractor to operate, maintain, install, refuel, and repair facility and power distribution components, including electric circuits, control systems, and all electric power generators. This opportunity is a Total Small Business Set-Aside.

Scope of Work

The contractor will be responsible for the full lifecycle management of electrical systems and generators, including:

  • Operating, maintaining, installing, refueling, and repairing energized and de-energized facility and power distribution components, electric circuits, electric control systems, and associated equipment.
  • Maintaining, repairing, and replacing all electric power generators, electrical systems, facilities, and spaces, including all accountable electrical Real Property Installed Equipment (RPIE).
  • Developing and maintaining an Electronic Preventative Maintenance and Inspection Program (EPMI) and managing liquid fuels systems.

Performance standards include maintaining steady state voltage within 5% of nominal, frequency within 59.5-60.5 Hz, restoring emergency power within 15 minutes (100% of the time), and completing 95% of scheduled EPMI tasks properly and timely.

Contract Details

  • Contract Type: Request for Quotation (RFQ), likely Firm Fixed-Price.
  • Period of Performance: A base period from June 1, 2026, to May 31, 2027, with option periods extending through May 31, 2031.
  • NAICS Code: 561210, Facility Support Services.
  • Set-Aside: Total Small Business.
  • Place of Performance: Offutt Air Force Base, NE.

Submission & Evaluation

  • Questions Due: May 7, 2026, 11:00 AM CDT.
  • Offers Due: May 18, 2026, 11:00 AM CDT.
  • Submission: Offers must be submitted via email to the Contracting Office, not exceeding 30 pages, in a single PDF.
  • Evaluation Factors: Total evaluated price (TEP) and technical information, including a shift schedule for 24/7 manning, a standard operating procedure for government-ordered generator backup power, previous work references, and certifications/experience.
  • The Government intends to award without discussions.

Key Requirements & Attachments

Offerors must be registered in SAM.gov. The solicitation incorporates provisions and clauses by reference. Key documents include the updated Performance Work Statement (PWS), Technical Questions and Answers (Q&A 2.0), Wage Determination 2015-5005 V.28, and various DD Form 1423s detailing data deliverables (e.g., EPMI, fuel tank consumption, outage reporting, labor reporting). Environmental Special Conditions (Appendix E) and Tank Compliance Documentation (Appendix F) outline critical environmental and regulatory obligations. Contractor personnel require a favorable National Agency Check with Inquiries (NACI) and compliance with CMMC Level 2 for Controlled Unclassified Information (CUI).

People

Points of Contact

TSgt Jennifer PrestridgePRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: May 12, 2026
Version 1
Combined Synopsis/Solicitation
Posted: May 4, 2026
View
B518 Generator Maintenance and Operations | GovScope