BACK PLATE
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy / NAVSUP WEAPON SYSTEMS SUPPORT MECH is soliciting proposals for the manufacture of a BACK PLATE (P/N: 5648264, CAGE CODE 53711). This opportunity is a Total Small Business Set-Aside. The Request for Quotation (RFQ) closing date has been extended to March 9, 2026.
Scope of Work
This contract requires the manufacture of the BACK PLATE, SPRING (P/N: 5648264), which must meet the material and physical requirements specified in Drawing 5648264 Rev_A. Key requirements include:
- Manufacturing and Design: Adherence to material and physical specifications per Drawing 5648264 Rev_A.
- Marking: Items must be marked in accordance with applicable Military Standards (MIL-STD-130, MIL-STD-1285, MIL-STD-454, MIL-P-15024/5) unless otherwise specified.
- Configuration Control: MIL-STD-973, Paragraph 5.4.8 (Short Form Procedure), is incorporated, requiring submission of Engineering Change Proposals, Requests for Deviations, and Waivers.
Contract & Timeline
- Type: Solicitation (RFQ)
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Response Due: March 9, 2026 (COB)
- Published: February 10, 2026
Quality Assurance & Packaging
- Inspection: The contractor is responsible for all inspection requirements. Government Source Inspection per FAR 52.246-2 is required.
- Compliance: All items must meet contract requirements; the contractor is responsible for ensuring compliance.
- Records: Inspection records must be kept for 365 days after final delivery.
- Packaging: MIL-STD 2073 packaging applies as found elsewhere in the schedule.
Additional Notes
Drawings can be viewed or downloaded from www.sam.gov by entering the solicitation number. Information on ordering reference documents (DODSSP, Commercial Specifications, Ordnance Standards, NOFORN documents, Nuclear Reactor Publications, Technical Manuals) is provided in detail.