Balance Spindle Assembly Overhaul

SOL #: FA822826R0001Combined Synopsis/SolicitationSole Source

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8228 AFSC OL H PZIM
HILL AFB, UT, 84056-5805, United States

Place of Performance

Hill Air Force Base, UT

NAICS

Precision Turned Product Manufacturing (332721)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Aircraft Components And Accessories (J016)

Set Aside

No set aside specified

Timeline

1
Posted
Jan 21, 2026
2
Last Updated
Feb 17, 2026
3
Submission Deadline
Feb 25, 2026, 6:30 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force (FA8228 AFSC OL H PZIM) is seeking a sole source acquisition for the overhaul of Balance Spindle Assemblies required for F-22, F-15, and B-2 Power Take Off (PTO) shafts. This requirement is sole sourced to Goodrich Corporation Collins Aerospace due to proprietary designs and technical data. Offers are due by February 3, 2026, at 2330 MT.

Scope of Work

The contractor will provide all labor, supplies, tooling, and equipment to overhaul three Balance Spindle assemblies, restoring them to original manufacturer specifications. The Government will ship the spindles to the contractor's facility, and the contractor will perform an overhaul, including a functionality check, before shipping them back to Hill Air Force Base (AFB). A standard commercial warranty on the rebuilt spindles is required.

Contract Details

  • Type: Combined Synopsis/Solicitation, Sole Source
  • Pricing: Firm Fixed Price (FFP) for all items.
  • Period of Performance: Approximately 5 months per item, from February 4, 2026, to July 4, 2026.
  • Set-Aside: Sole Source to Goodrich Corporation Collins Aerospace.
  • NAICS Code: 332721 (Aircraft Components and Accessories Maintenance, Repair, and Rebuilding).
  • Size Standard: 500 employees.
  • Place of Performance: Contractor's facility for overhaul; delivery to Hill AFB, UT.

Key Requirements & Deliverables

The overhaul includes specific B-2 (U10106/U11202), F-15/F-16 (U11032/U11464), and F-22 (U11084/U11085) spindles. Each PTO shaft assembly must be dynamically balanced to tight tolerances to prevent torsional vibration. A Validation Completion Report (CDRL A001), documenting the overhaul process and certifying compliance with original manufacturing specifications, is a required deliverable.

Submission & Evaluation

  • Offers Due: February 3, 2026, 2330 MT.
  • Submission Method: Electronic mail to merrick.flygare@us.af.mil and costadena.bournakis@us.af.mil.
  • Required Information: CAGE code, SAM registration.
  • Questions Due: January 30, 2026, 2330 MT, to the same email addresses.
  • Evaluation: As a sole source acquisition, the evaluation will confirm the contractor's capability to perform the required overhaul services. The solicitation incorporates various FAR and DFARS clauses by reference.

Additional Notes

The spindles are Government Furnished Property (GFP), and the contractor will be liable for any loss, damage, destruction, or theft. The sole source justification is based on Collins Aerospace's proprietary designs, technical data, and engineering methodologies, with no authorized distributors for this overhaul service. This overhaul is critical to avoid work stoppage at Hill AFB.

People

Points of Contact

Costadena BournakisPRIMARY
Merrick FlygareSECONDARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 3Viewing
Combined Synopsis/Solicitation
Posted: Feb 17, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Feb 5, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Jan 21, 2026
View
Balance Spindle Assembly Overhaul | GovScope