Baptist Camp Bridge Maintenance

SOL #: 127EAX26Q0009Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
Tonto National Forest
PHOENIX, AZ, 85006, United States

Place of Performance

AZ

NAICS

Highway (237310)

PSC

Maintenance Of Highways/Roads/Streets/Bridges/Railways (Z1LB)

Set Aside

Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15) (WOSB)

Timeline

1
Posted
Mar 13, 2026
2
Last Updated
Mar 16, 2026
3
Submission Deadline
Apr 7, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Forest Service, Tonto National Forest, is soliciting quotations for Baptist Camp Bridge Maintenance in the Payson Ranger District, Arizona. This project involves comprehensive repairs and upgrades to ensure the bridge's structural integrity and safety. This acquisition is a Women-Owned Small Business (WOSB) Program Set-Aside. Quotations are due April 7, 2026.

Scope of Work

The project focuses on the Baptist Camp Bridge on Forest Service Road 3675, a one-lane bridge spanning Tonto Creek. Key tasks include:

  • Repairing the wearing surface: Installing a new timber wearing surface with treated planks (Douglas Fir-Larch, Hemlock, Spruce) and wood preservative.
  • Deck maintenance: Cleaning, filling, and sealing the existing bridge deck.
  • Drainage restoration: Improving upstream drainage.
  • Structural repairs: Replacing missing or damaged timber posts and blocks on the guardrail.
  • Approach repairs: Repairing and resurfacing asphalt approaches with base aggregate and asphalt concrete pavement for a smooth transition.
  • Safety upgrades: Replacing object markers according to MUTCD specifications.
  • Ancillary services: Mobilization, temporary traffic control, and filler/sealant installation.

Contract Details

  • Opportunity Type: Combined Synopsis/Solicitation (RFQ)
  • Contract Type: Firm-Fixed-Price (anticipated)
  • Period of Performance: 60 days from Notice to Proceed (NTP).
  • Set-Aside: SBA Certified Women-Owned Small Business (WOSB)
  • NAICS: 237310 (Highway, Street, and Bridge Construction) with a $45M size standard.
  • PSC: Z1LB (Maintenance Of Highways/Roads/Streets/Bridges/Railways)
  • Place of Performance: Tonto National Forest, Payson Ranger District, Gila County, Arizona.

Key Requirements & Deliverables

All work must adhere to US DOT FHWA "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14" and Forest Service Supplemental Specifications. The contractor must follow the Tonto Fire Plan and provide their own water (no pumping from Tonto Creek). Initial deliverables, due within 5-10 business days of award, include a Temporary Traffic Control Plan, Project Schedule, Hazardous Spill Prevention Plan, Erosion and Sediment Control Plan, and Manufacturer Specifications for materials. Prevailing wage rates for Gila County, Arizona (Heavy Construction) apply.

Evaluation & Submission

Award will be made to the offeror representing the best value to the Government, considering Technical Approach, Past Performance, and Price. Technical proposals should not exceed 5 pages. Required submission documents include a Transmittal Summary Letter, completed SF 1442, and a fillable Schedule of Items (Excel).

  • Site Visit: March 23, 2026, at 11:00 AM local time. Confirm attendance by March 20, 2026, via email to Nicholas Estrada-Stephen.
  • Questions Due: March 30, 2026, 1:00 PM Mountain Time.
  • Quotations Due: April 7, 2026, by 12:00 PM Mountain Time.
  • Submission Method: Email quotes to toinette.aranda@usda.gov.

Point of Contact

Toinette Aranda (toinette.aranda@usda.gov)

People

Points of Contact

Toinette ArandaPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: Mar 16, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Mar 13, 2026
View
Baptist Camp Bridge Maintenance | GovScope