Y--BASIN VIEW PIPELINE PHASE II
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Bureau of Land Management (BLM), Montana State Office, has issued an Award Notice for the BASIN VIEW PIPELINE PHASE II project. This contract, a Total Small Business Set-Aside, is for the construction of a livestock pipeline in Dawson County, Montana. While the award has been made, specific details regarding the awardee and contract value are not provided in this notice.
Scope of Work
The project involves the construction of approximately 3931 feet of 2-inch and 9056 feet of 1.5-inch livestock pipeline. This includes trenching or plowing the pipeline to a 5-foot depth and installing all appurtenances to a 6-foot frost-free depth. Key tasks include:
- Trenching, plowing, backfilling, and compacting.
- Installation of water systems using PVC or HDPE pipe.
- Reclamation of disturbed areas, including topsoil placement and seeding.
- Compliance with various ASTM, AWPA, NSF, NEC, and OSHA standards.
Contract Details
- Type: Firm Fixed-Price (FFP), Single Award Construction Contract.
- Estimated Range (Solicitation): Between $25,000 and $100,000.
- Period of Performance: July 15, 2026, to October 31, 2026.
- Set-Aside: Total Small Business Set-Aside (NAICS 237110, $45.0M size standard).
- Award Date: Published as an Award Notice on April 20, 2026.
Solicitation History & Clarifications
The original solicitation required quotes by March 30, 2026, via email, with evaluation based on price and past performance. A mandatory site visit was held on March 17, 2026. Amendments clarified:
- A Bid/Offer Guarantee was not required, but a Payment Bond was required.
- Technical specifications were updated, including acceptable pressure reducing valve (150 PSI), BLM supplying hydrant signs, and specific hydrant requirements.
- The BLM secured the Dawson County Road Crossing Permit.
- Contractors were responsible for utility locating (Montana One Call System) and a 1-year warranty.
- Construction was restricted between March 15 - July 15 (bird nesting) and December 1 - March 31 (big game species).
Contact Information
For historical reference, the primary contact was Chad Clapp at cclapp@blm.gov.