Basketball court reconstruction

SOL #: 19AU9026Q0010Pre-Solicitation

Overview

Buyer

State
State, Department Of
U.S. EMBASSY VIENNA
WASHINGTON, DC, 20520, United States

Place of Performance

Vienna, AT-9, Austria

NAICS

All Other Specialty Trade Contractors (238990)

PSC

Maintenance Of Troop Housing Facilities (Z1FC)

Set Aside

No set aside specified

Timeline

1
Posted
Jun 11, 2026
2
Response Deadline
Jul 29, 2026, 8:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. EMBASSY VIENNA has issued a Presolicitation for the reconstruction of a basketball half-court at the U.S. Embassy Vienna Marine House in Vienna, Austria. This project involves demolishing the existing court and constructing a new, larger one with updated lighting. Responses are due by July 29, 2026.

Scope of Work

The project entails the complete reconstruction of an outdoor basketball half-court. Key tasks include:

  • Demolition: Removal and disposal of the existing 7x8m asphalt court, exterior lights, and basketball basket with posts. Soil removal for a new 13x14m court (182m², 0.3m depth).
  • Construction: Preparation and installation of subgrade/subbase with drainage, installation of an EPDM rubber surface (or equivalent), point foundations for one adjustable basketball hoop and two light poles, installation of new lighting with cabling, laying stone slabs around the court, painting lines, and final cleaning.
  • Special Requirements: Work must be carried out while the facility remains operational and residents are present, minimizing disturbance. Adherence to USG Security regulations, including clearance processes for personnel, vehicles, and materials, is mandatory. Safety and protective measures are also required.

Contract & Timeline

  • Type: Presolicitation
  • Set-Aside: None specified
  • Response Due: July 29, 2026, 08:00 AM (CET)
  • Published: June 11, 2026
  • Indicative Construction Schedule: 5 weeks in Fall 2026

Additional Notes

This Presolicitation is for planning purposes, with further details expected in a subsequent solicitation. Interested parties should monitor for future updates. Primary Contact: Zahid Raja (rajazm@state.gov) Secondary Contact: Daniel Worel (woreld@state.gov)

People

Points of Contact

Zahid RajaPRIMARY
Daniel WorelSECONDARY

Files

Files

No files attached to this opportunity

Versions

Version 1Viewing
Pre-Solicitation
Posted: Jun 11, 2026
Basketball court reconstruction | GovScope