Berlin Lake - Roof Replacements
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers (USACE), Pittsburgh District, is conducting a Sources Sought to identify qualified Total Small Business vendors for Roof Replacement services at Berlin Lake in Deerfield, Ohio. This project involves replacing the roofs, gutters, and downspouts on the Resource Manager’s Office and the Maintenance building. Capability statements are requested by February 18, 2026.
Scope of Work
The project entails the comprehensive replacement of roofing systems for two buildings: the Resource Manager’s Office (a two-story, Minimal Traditional-style brick house built in 1945) and the Maintenance building (constructed around September 1976, with concrete block, brick fascia, and wood truss framing). Tasks include:
- Removal and disposal of all existing roofing materials (shingles, felt, flashing, pipe boots, drip edges, gutters).
- Installation of new roofing underlayment, ice barrier, shingles, ridge vents, pipe boots, louvered attic vents, and flashing around all roof penetrations.
- Replacement of gutters and downspouts with new aluminum seamless systems.
- Removal and reinstallation of the lightning protection system on the Resource Manager’s Office.
Key Requirements & Standards
All materials must be unused and meet specified requirements. The new roofing system must carry a minimum 30-year manufacturer's warranty on shingles and a 5-year workmanship warranty. Final acceptance is contingent on watertight installation. The contractor must complete all work within 90 calendar days after the Notice to Proceed, generally between 7:00 AM and 5:00 PM, Monday through Friday. Required submittals include a Submittal Register, Quality Control Plan (QCP), Accident Prevention Plan (APP), key personnel credentials (Superintendent, QCSM, SSHO, each with minimum 5 years experience), manufacturer's certifications, product data, samples, and a project schedule. Compliance with EM 385-1-1 and a waste management plan are also mandatory.
Contract & Timeline
- Type: Sources Sought (Market Research)
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Response Due: February 18, 2026, 1:00 PM EST
- Published: February 11, 2026
- Place of Performance: Berlin Lake, Deerfield, Ohio
Attachments & Context
Detailed reference drawings (Attachment 2, 2a) provide architectural and engineering specifics for both buildings, including floor plans, elevations, sections, and construction details. Reference photos (Attachment 3) offer visual context of current conditions, highlighting areas like missing shingles and damaged gutters. These documents are critical for understanding the scope and preparing capability statements.
Action Item
Interested vendors are requested to submit their company’s capability statement to the Contract Specialist, Isaiah Johnson, at isaiah.m.johnson@usace.army.mil.