BEZEL,LOWER,CONTROL
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy / NAVSUP Weapon Systems Support is soliciting for the repair, testing, and inspection of BEZEL,LOWER,CONTROL items (Product Service Code 1680 - Miscellaneous Aircraft Accessories And Components). This opportunity requires contractors to return units to a "Ready For Issue (RFI)" condition, encompassing overhaul, upgrade, and repair. Proposals are due March 26, 2026.
Scope of Work
The contractor will be responsible for providing all necessary facilities, labor, materials, parts, and test/tooling equipment. Key tasks include:
- Repair, testing, and inspection of BEZEL,LOWER,CONTROL items.
- Overhaul, upgrade, and repair to achieve "Ready For Issue (RFI)" status.
- Adherence to specific procedures for Beyond Economical Repair (BER), Missing on Induction (MOI), and Over and Above Repair (OAR) items, requiring Government concurrence.
- Use of SAE-AS22759 series wire in lieu of MIL-W-81381.
- Compliance with IPC/EIAJ-STD-001C for personnel performing tasks.
Contract & Timeline
- Type: Solicitation for Firm Fixed Price Repair Purchase Orders.
- Set-Aside: None specified.
- Response Due: March 26, 2026, 8:30 PM EST.
- Published: February 24, 2026.
Key Requirements
Offerors must establish and maintain a quality system compliant with ISO 9001/SAE AS9100 and a calibration system meeting ANSI/NCSL Z540.3 or equivalent. A configuration management plan in accordance with NAVICPIA18 is also required. All parts and materials must be new per FAR 52.211-5, with specific approval needed for exceptions or cannibalization. The contractor must specify the repair source and location.
Additional Information
The Government will not provide equipment such as fixtures, jigs, dies, or special tooling. The contractor is responsible for ensuring access to updated drawings and specifications. Changes to manuals, drawings, specifications, or manufacturing sources require PCO approval.