B&F - ALD - Admin VRF System Repair - 26Z1AW4
SOL #: 15B10126Q00000014Combined Synopsis/Solicitation
Overview
Buyer
Justice
Federal Prison System / Bureau Of Prisons
FPC ALDERSON
ALDERSON, WV, 24910, United States
Place of Performance
WV
NAICS
Electronic and Precision Equipment Repair and Maintenance (811210)
PSC
Maintenance, Repair And Rebuilding Of Equipment: Pumps And Compressors (J043)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
May 29, 2026
2
Submission Deadline
Jun 16, 2026, 6:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Justice, Federal Bureau of Prisons (FBP) FPC Alderson has issued a Request for Quotes (RFQ) for the repair of the Administration Building's VRF (Variable Refrigerant Flow) system at their facility in Alderson, WV. This opportunity is a Total Small Business Set-Aside and seeks qualified contractors to provide all necessary equipment, tools, labor, materials, supervision, and warranties. The government anticipates awarding a Firm-Fixed-Price (FFP) contract.
Scope of Work
The contractor will be responsible for the comprehensive repair of the VRF system, including:
- Pre-Work Inspection and Preparation: Site assessment, system shutdown, safety protocols, and tool verification.
- Removal of Existing Compressor: Refrigerant recovery, disconnection, and removal of the faulty unit.
- Installation of New Compressor: Site preparation, positioning, alignment, and reconnection.
- System Recharging and Testing: Leak testing, refrigerant recharge, and operational performance verification.
- Inverter Board Replacement: Removal of the existing VRF Inverter board and installation of a new one, with all electrical and communication cables reconnected.
- Clean-Up and Site Restoration: Removal of debris and restoration of the work area.
Contract Details
- Contract Type: Firm-Fixed-Price (FFP)
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- NAICS Code: 811210 (Electronic and Precision Equipment Repair and Maintenance)
- Small Business Size Standard: $45 million
- Product Service Code: J043 (Maintenance, Repair And Rebuilding Of Equipment: Pumps And Compressors)
- Place of Performance: FPC Alderson, 1 Glen Ray Road, Alderson, WV 24910
- Warranty: A written five-year guarantee covering all material and workmanship is required, along with manufacturer warranties. A minimum one-year workmanship warranty is also specified.
Submission & Evaluation
- Questions Due: June 9, 2026, 12:00 PM EST, submitted in writing to arhedrick@bop.gov.
- Quotation Deadline: June 17, 2026, 2:00 PM EST. Bids must be submitted via email to ARHedrick@bop.gov. Faxed or hand-delivered bids will not be accepted.
- Submission Requirements: Offerors must include a specification sheet and any submittal information for services/products offered. Registration in SAM.gov and completion of necessary representations and certifications are mandatory.
- Evaluation Criteria: Award will be based on the government's evaluation of genuine quality, capability, and competitive price. Technical acceptability, past performance, and price will be evaluated in accordance with FAR 52.212-2. A history of default or chronic performance issues may lead to rejection.
Special Requirements
- Compliance: All services and equipment must comply with Federal, state, and local regulations, including IBC, NFPA, Life Safety Code, OSHA, and American Correctional Association Standards.
- Contractor Experience: Offerors must be reputable and provide documented proof of experience if requested.
- Work Hours: 7:00 AM – 3:00 PM, Monday - Friday, excluding weekends and federal holidays.
- Security Clearance: All personnel require security clearance and badging within 14 days of Notice to Proceed.
- Wage Determination: The Service Contract Act (SCA) Wage Determination WD 2015-4351 for West Virginia applies, outlining minimum wage rates and fringe benefits for labor.
People
Points of Contact
Allison HedrickPRIMARY
Files
Versions
Version 1Viewing
Combined Synopsis/Solicitation
Posted: May 29, 2026