Big River Trap 31 CP Pilot Project

SOL #: W912P926R8917Award Notice

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W07V ENDIST ST LOUIS
SAINT LOUIS, MO, 63103-2833, United States

Place of Performance

Place of performance not available

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Repair Or Alteration Of Other Conservation And Development Facilities (Z2KZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jun 22, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

This is an Award Notice for the Big River Trap 31 CP Pilot Project, issued by the Department of the Army, W07V ENDIST ST LOUIS. The notice includes Amendment 0002, which adds Bond clauses and posts Q&A, and Amendment 0001, which attached a Hold Harmless Agreement. This project was a Total Small Business Set-Aside Request for Task Order Proposal, exclusively for current PL84-99 MATOC holders. The original proposal due date was May 22, 2026, and this notice was published on June 22, 2026, after the proposal deadline.

Scope of Work

The project involves constructing an off-channel sediment trap at River Mile 31 of the Big River. The primary objective is to establish controlled deposition of targeted lead-impacted sediments in the immediate vicinity of known freshwater mussel beds. The Product Service Code is Z2KZ (Repair Or Alteration Of Other Conservation And Development Facilities).

Contract & Timeline

  • Type: Award Notice (referencing a past Request for Task Order Proposal)
  • Set-Aside: Total Small Business (FAR 19.5)
  • Target Audience: Current PL84-99 MATOC Holders Only
  • Original Proposal Due: May 22, 2026, at 10:00 a.m. CDT (Date has passed)
  • Original Site Visit: May 7, 2026, at 9:00 a.m. (Date has passed)
  • Published Date: June 22, 2026

Amendments & Inquiries

  • Amendment 0002: Added Bond clauses and posted Q&A.
  • Amendment 0001: Attached the Hold Harmless Agreement for Contractor Review.
  • Questions: All questions were to be submitted via the Bidder Inquiry Portal in ProjNet (http://www.projnet.org/projnet) by May 11, 2026, at 9:00 a.m. CDT.

Contact Information

People

Points of Contact

Files

Files

View
View
View
View

Versions

Version 1Viewing
Award Notice
Posted: Jun 22, 2026
Big River Trap 31 CP Pilot Project | GovScope