Black Avenue Furnace Replacement

SOL #: 1240LS26Q0003Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA INTERMOUNTAIN 7
Ogden, UT, 844012310, United States

Place of Performance

Big Piney, WY

NAICS

Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance (811310)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Refrigeration, Air Conditioning, And Air Circulating Equipment (J041)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 6, 2026
2
Submission Deadline
Jan 20, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

The United States Department of Agriculture (USDA), Forest Service (FS), Intermountain Region, Bridger-Teton National Forest has a need for decommissioning, removal and replacement of a non-functional natural gas furnace at a Forest Service owned residential facility. Project location is at 421 Black Avenue, Big Piney, WY, 83113. See Attachment 2 – Statement of Work.

The following documents are included as attachments to this solicitation and can be accessed via the “Attachments/Links” section of the posting.
•Attachment 1 – Solicitation Terms and Conditions.
•Attachment 2 – Statement of Work.
•Attachment 3 – Schedule of Items.
•Attachment 4 – Wage Determination.
•Exhibit #1 – Past Performance and Equipment Questionnaire.
•Exhibit #2 – SF-1413 Subcontractor Form (If Applicable).

AT A MINIMUM, QUOTERS SHALL SUBMIT THE FOLLOWING DOCUMENTS BACK WITH THEIR RESPONSE TO THIS SOLICITATION:                                                                                                                                                                                    1.Schedule of Items (including Quoter’s Company Information)                                                                                                    2.Certification that repairs can be completed by the date listed in the SOW, and in theDelivery Information Section. See Exhibit #1.  3.Any Amendment that may be issued.                                                                                                                                                  4.Exhibit #1 Past Performance and Equipment Questionnaire.                                                                                                              5.Exhibit #2 SF-1413 Subcontractor Form (If Applicable).                                                                                                                  6.Technical Response as Identified in Evaluation and Basis for Award, EvaluationCriteria, Price, Technical Acceptability, and Past Performance.

People

Points of Contact

Whit FausettPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Jan 6, 2026
Black Avenue Furnace Replacement | GovScope