Blackfeet Adult Detention Center Roof Replacement
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Bureau of Indian Affairs (BIA), under the Department of the Interior, has issued a Combined Synopsis/Solicitation for the Blackfeet Adult Detention Center Roof Replacement project. This is a competitive ISBEE (Indian Small Business Economic Enterprise) set-aside acquisition to remove the existing roofing system and install a new, fully adhered 80 mil Thermoplastic Polyolefin (TPO) roofing system on Building #126, including water damage repair. Proposals are due by June 23, 2026, at 7:00 PM local time.
Scope of Work
The project involves the comprehensive replacement of the roof at the Blackfeet Adult Detention Center. Key tasks include:
- Removal and proper disposal of the existing roofing system.
- Installation of a new, fully adhered 80 mil TPO roofing system with insulation.
- Repair of any water damage to the existing roof and drainage system.
- Installation of new roof jacks, flashing, counter flashing, drip edge, and coping.
- Replacement of drain fixtures and removal of obsolete or damaged roof equipment.
- The new roofing system must carry a thirty (30) year warranty.
Contract Details
- Contract Type: Implied Fixed-Price.
- Set-Aside: Competitive ISBEE (Indian Small Business Economic Enterprise).
- Period of Performance: Sixty (60) calendar days after issuance of Notice to Proceed (NTP).
- Liquidated Damages: $1044 for each calendar day of delay.
- Magnitude of Construction: Less than $750,000.00.
Submission & Evaluation
- Proposals Due: June 23, 2026, by 7:00 PM local time.
- Submission Method: Electronically to kurt.egner@bia.gov in .pdf, .docx, or .xlsx format.
- Evaluation Criteria: Award will be based on the lowest total evaluated price.
- Quote Validity: Quotes must be valid for ninety (90) days past the closing date.
Key Requirements & Special Conditions
- Offerors must submit pricing, a completed Section K, and the Indian Affairs Indian Economic Enterprise Representation Form (Attachment 8).
- Performance and Payment Bonds are required.
- Compliance with Davis-Bacon Act and applicable prevailing wage rates (Attachment 7).
- Adherence to Tribal Employment Rights Ordinance (TERO) and applicable tribal taxes.
- The building will be occupied during the project; contractors must provide and obtain approval for safety provisions.
- Contractors are responsible for obtaining all required state, local, and tribal permits.
- A background investigation will be necessary for personnel requiring interior access to the facility.
Attachments
Detailed architectural drawings (Attachments 2, 3, 4, 5), the Statement of Work (Attachment 1), TPO roofing specifications (Attachment 6), and the IEE Representation Form (Attachment 8) are provided to inform bidding and project execution.