Blackrock District Parking Lot Repairs

SOL #: 1240LT26Q0009Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
BRIDGER-TETON NATIONAL FOREST
JACKSON, WY, 83001, United States

Place of Performance

WY

NAICS

All Other Specialty Trade Contractors (238990)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 20, 2026
2
Last Updated
Feb 10, 2026
3
Submission Deadline
Feb 16, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service, Bridger-Teton National Forest, is soliciting proposals for Blackrock District Parking Lot Repairs in Teton County, Wyoming. This Total Small Business Set-Aside opportunity covers asphalt crack sealing, slurry sealing, and pavement markings, with optional concrete and asphalt patching. Offers are due by February 16, 2026, at 09:00 AM local time.

Scope of Work

This project involves comprehensive parking lot repairs at the Blackrock District Office and Work Center. The work is located at the Blackrock Ranger District, accessed via U.S. Highway 26, approximately 38 miles northeast of Jackson, Wyoming.

Base Quote Items include:

  • Asphalt crack sealing (approx. 1700 LF).
  • Slurry sealing all asphalt pavements at the Blackrock District Office and Work Center.
  • White permanent pavement parking stall markings, including one ADA style stall.

Optional Quote Items include:

  • Removal and replacement of existing concrete sidewalk with new reinforced cement concrete.
  • Full depth asphalt pavement patching (3” depth, Type II) at two locations.

Contract Details

This is a Combined Synopsis/Solicitation for commercial items. The Government intends to make one award. The period of performance for base items is from June 15, 2026, to July 15, 2026, with an overall project performance period from June 1, 2026, to September 30, 2026. The contract time for the work is 5 calendar days. A bid guarantee, performance, and payment bonds are mandatory. Offers must remain valid for 90 calendar days.

Submission & Evaluation

Offers are due by February 16, 2026, at 09:00 AM local time. Award will be made to the offeror representing the best value to the Government, based on a Lowest Price Technically Acceptable (LPTA) evaluation. Evaluation factors include:

  • Price: Must be fair and reasonable.
  • Technical Acceptability: Demonstrating a sound and compliant approach.
  • Past Performance: May be evaluated using CPARS, USDA, or other government sources. Offerors must provide pricing for all base and optional items to be considered responsive.

Key Requirements & Notes

Contractors must coordinate crack seal and slurry seal work with the Contracting Officer's Representative (COR) 21 days prior to work and submit a traffic control plan. All construction equipment must be pressure washed before entering National Forest System lands to prevent noxious weeds. The project is allocated for one mobilization. A Wage Determination (GDN WY20250044, effective 01/02/2026) for Heavy and Highway Construction in Wyoming applies, requiring compliance with Davis-Bacon Act wage rates. Significant modifications to the Forest Service Supplemental Specifications (FSSS) are detailed, including updates to sections 101, 103, 104, 105, 106, 107, 109, and replacement of sections 102, 108, 155, 403, and 414. Bidders must carefully review these changes.

People

Points of Contact

Derrick A DodsonPRIMARY
Katy BilisolySECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: Feb 10, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Jan 20, 2026
View
Blackrock District Parking Lot Repairs | GovScope