Bldg. 200 Energy Repairs/Upgrades
SOL #: W50S8D26QA012Combined Synopsis/Solicitation
Overview
Buyer
DEPT OF DEFENSE
Dept Of The Army
W7NR USPFO ACTIVITY NYANG 105
NEWBURGH, NY, 12550-5042, United States
Place of Performance
Newburgh, NY
NAICS
Commercial and Institutional Building Construction (236220)
PSC
Maintenance Of Maintenance Buildings (Z1EB)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
May 18, 2026
2
Last Updated
May 27, 2026
3
Submission Deadline
Jun 16, 2026, 3:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army is soliciting quotes for Bldg. 200 Energy Repairs/Upgrades at the 105th Airlift Wing, Stewart Air National Guard Base, Newburgh, NY. This is a 100% Total Small Business Set-Aside for construction services, with a project magnitude between $750,000 and $1,000,000. The project aims to enhance energy efficiency and modernize facility systems. Quotes are due June 26, 2026, at 11:00 AM EST.
Scope of Work
This Firm Fixed Price (FFP) contract involves comprehensive energy efficiency upgrades for Building 200, including:
- Demolition and Installation: Removal of existing building envelope components (overhead doors, ribbon window systems, transoms, skylights) and installation of new insulated, motor-operated coiling overhead doors, thermally-broken ribbon window systems with insulated glass, transoms, and insulated roof caps.
- Heating System Upgrade: Furnishing and installing seven new low-intensity, gas-fired radiant heaters, complete with natural gas piping and exhaust vents. Commissioning of these heaters must be performed by a Trane Certified Technician.
- Electrical and Controls: Providing electrical and controls support, including disconnecting/reconnecting overhead door motors, installing new 120V circuits for heaters, and connecting to the Building Automation System (BAS) via programmable thermostats.
- Technical Details: Specific mechanical legends, electrical schedules, equipment connections, and cable schedules are detailed in accompanying documents (M-B3 and E-B3).
Contract Details
- Contract Type: Firm Fixed Price (FFP)
- Project Magnitude: $750,000.00 - $1,000,000.00
- Set-Aside: 100% Total Small Business (NAICS 236220, size standard $45M)
- Place of Performance: Stewart Air National Guard Base, Newburgh, NY
- Period of Performance: 180 calendar days, commencing within 10 days after Notice to Proceed (NTP).
- Applicable Wage Rates: Construction wage rates (General Decision Number: NY20260007, Modification Number 2, dated 05/18/2026 for Orange County, New York) apply.
Submission & Evaluation
- Quote Due Date: June 26, 2026, 11:00 AM EST.
- Submission Method: Electronically to joseph.kugler.1@us.af.mil.
- Required Submissions: A bid bond (SF 24 form) and Power of Attorney must be submitted with the quote. Performance and payment bonds are mandatory within 10 calendar days after award.
- Evaluation Factors: Price and Technical Capability (Past Experience and Project Schedule). Award will be made to the lowest priced, technically acceptable offer.
- Site Visit: A site visit will be offered on June 16, 2026, at 10:00 AM EST. Pre-registration instructions are in the SF 1442 solicitation document.
- Pricing Validity: Quotes must be valid for 75 calendar days.
Important Notes
- Funds are not presently available for this acquisition; award is contingent upon appropriated funds.
- Contractor personnel must comply with all installation regulations, including security, safety, and traffic, and undergo background checks for base access.
- A Quality Control Plan (QCP) is required, and material selection must reference Unified Facilities Criteria (UFC) standards.
People
Points of Contact
Joseph KuglerPRIMARY
Kevin FennerSECONDARY
Files
Files
No files attached to this opportunity
Versions
Version 2
Combined Synopsis/Solicitation
Posted: May 27, 2026
Version 1Viewing
Combined Synopsis/Solicitation
Posted: May 18, 2026