Bldg Repair & Renovation - Garrison Consolidation

SOL #: W519TC26RB104Sources Sought

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QK ACC-RI
ROCK ISLAND, IL, 61299-0000, United States

Place of Performance

Rock Island, IL

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Office Buildings (Z2AA)

Set Aside

No set aside specified

Timeline

1
Posted
May 12, 2026
2
Response Deadline
May 22, 2022, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Army Contracting Command - Rock Island Arsenal is issuing a Sources Sought Notice for the Building 104 Garrison Consolidation construction project at the U.S. Army Garrison (USAG) Rock Island Arsenal (RIA) in Rock Island, Illinois. This project involves the repair and alteration of an existing office building. Responses are due by 3:00 PM Central Time on May 22, 2026.

Scope of Work

The project entails the repair and renovation of approximately 13,290 sq. ft. of an existing office building. Key tasks include:

  • Demolition, minor asbestos abatement, and disposal.
  • Construction of new open offices, private offices, and conference rooms.
  • Installation of new walls, doors, flooring, and repair of existing elements.
  • Repair of approximately 9,510 sq. ft. of reflected ceiling tiles and first-floor light fixtures.
  • Installation of new window coverings, storefront windows, 75" TV monitors, and a through-wall storage depository safe.
  • Painting of new and existing walls.
  • Relocation and storage of existing furniture.
  • Repair of four historical stairwells.
  • Significant revisions and extensions to HVAC, plumbing, electrical, data/comm, and access control systems.
  • Minimizing disruption to building occupants is critical, as large portions of the building will remain occupied.
  • Proper handling and disposal of known asbestos and lead-containing materials is mandatory.

Contract & Timeline

  • Type: Sources Sought Notice (Market Research)
  • Duration: Work to be completed within 120 working days after Notice to Proceed (NTP).
  • Set-Aside: None specified.
  • Response Due: May 22, 2026, 3:00 PM CT.
  • Published: May 12, 2026.
  • Place of Performance: Building 104, US Army Garrison, Rock Island Arsenal, Rock Island, IL.

Submission Requirements

Interested sources should provide a capability statement to Hila Anderson (hila.r.anderson.civ@army.mil) including:

  • Details of previous, in-scope projects (dates, organizations).
  • CAGE code.
  • Small business designation.
  • Business size status.

Additional Notes

This is solely a Sources Sought Notice for market research and does not constitute a solicitation or an obligation for the Government to award a contract. The Government will not reimburse expenses for responses or accept requests for meetings/briefings. Information gathered may inform future solicitations.

People

Points of Contact

Hila AndersonPRIMARY

Files

Files

Download

Versions

Version 1Viewing
Sources Sought
Posted: May 12, 2026
Bldg Repair & Renovation - Garrison Consolidation | GovScope