Boiler upgrade U.S. Embassy Madrid, Spain

SOL #: 19SP5026Q0012Questionsandanswers1Solicitation

Overview

Buyer

State
State, Department Of
U.S. EMBASSY MADRID
WASHINGTON, DC, 20520, United States

Place of Performance

MADRID, ES-MD, Spain

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Maintenance Of Office Buildings (Z1AA)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 17, 2026
2
Submission Deadline
May 7, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Department of State, through the U.S. Embassy Madrid, has issued a Solicitation for a Boiler Upgrade project at its facility in Madrid, Spain. This opportunity, identified by PSC Z1AA (Maintenance Of Office Buildings), aims to modernize the heating system. Responses are due by May 7, 2026, at 3:00 PM UTC.

Scope of Work

This project involves upgrading the existing boiler system. According to the recently published Questions & Answers document, the current system utilizes both a natural gas boiler and a diesel backup boiler to provide heating and domestic hot water. The natural gas system comprises three boilers, each approximately 575 kW, totaling 1,725 kW, while the backup diesel boiler is approximately 1,200 kW. The system operates in a closed-loop configuration.

Contract & Timeline

  • Type: Solicitation
  • Set-Aside: None specified
  • Product Service Code: Z1AA (Maintenance Of Office Buildings)
  • Response Due: May 7, 2026, 3:00 PM UTC
  • Published: April 17, 2026
  • Place of Performance: Madrid, Spain

Additional Notes

A Questions & Answers document (posted April 17, 2026) has been released, providing clarifications on the heating system's technical specifications. This document did not indicate any changes to solicitation requirements, due dates, or submission rules. Interested parties should review the Q&A for detailed system information.

Contact Information

For inquiries, contact Maria Jose Moyano at moyanomx@state.gov or +34915872219.

People

Points of Contact

Maria Jose MoyanoPRIMARY

Files

Files

Download

Versions

Version 1Viewing
Solicitation
Posted: Apr 17, 2026
Boiler upgrade U.S. Embassy Madrid, Spain | GovScope