Bolivar County, Mississippi, FC/MR&T, EBMRL, Seepage Remediation, Francis to Round Lake, Item 615-L

SOL #: W912EE26RA005Special Notice

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W07V ENDIST VICKSBURG
VICKSBURG, MS, 39183-3435, United States

Place of Performance

MS

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Other Non Building Facilities (Y1PZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 8, 2026
2
Last Updated
Feb 17, 2026
3
Action Date
Feb 18, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers (USACE) Vicksburg District is soliciting proposals for the Bolivar County, Mississippi, Seepage Remediation project (Item 615-L). This project involves the construction of seepage berms and related infrastructure along the East Bank Mississippi River Levee. This procurement is a Total Small Business Set-Aside restricted to the four holders of the FY 25 MATOC for Mississippi River Levees; however, this notice specifically highlights subcontracting opportunities for other firms. Proposals are due February 18, 2026.

Scope of Work

The contractor shall provide all labor, materials, and equipment for seepage remediation from Francis to Round Lake. Key tasks include:

  • Earthwork: Clearing and grubbing, uncompacted landside berm embankment construction, and borrow area excavation.
  • Infrastructure: Installation of culverts, water control structures, and ditch construction (Ditches 1-6).
  • Site Improvements: Levee surfacing with crushed stone, ramp transitions, and cattle guard installation.
  • Environmental: Mowing, turfing, erosion control matting, and storm water pollution prevention.

Contract & Timeline

  • Estimated Value: Between $5,000,000 and $10,000,000.
  • Performance Period: Work must be completed within 206 calendar days after the notice to proceed.
  • Set-Aside: Total Small Business Set-Aside.
  • Response Due: February 18, 2026 (Extended via Amendment 0003).
  • Primary Contact: Lawren Boolos (lawren.boolos@usace.army.mil).

Evaluation

Award will be made to the lowest responsive, responsible bidder among the authorized MATOC holders: Affolter Contracting Company, Inc., B&K Construction Company, LLC, Circle, LLC, and Tarpan Construction, LLC.

Additional Notes

Five amendments have been issued to date. Notable changes include revised specifications for clearing and embankment (Amendment 0005), updated plan and profile drawings for ditches and borrow areas (Amendment 0004), and a corrected Bidder Key for ProjNet inquiries (6RKCX6-55J8IQ).

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 7
Special Notice
Posted: Feb 17, 2026
View
Version 6Viewing
Special Notice
Posted: Feb 3, 2026
Version 5
Special Notice
Posted: Feb 2, 2026
View
Version 4
Special Notice
Posted: Jan 30, 2026
View
Version 3
Special Notice
Posted: Jan 15, 2026
View
Version 2
Special Notice
Posted: Jan 13, 2026
View
Version 1
Special Notice
Posted: Jan 8, 2026
View