BPM Cables - Flexible LMR for ALS-U
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Energy's Lawrence Berkeley National Laboratory (LBNL) has issued a Request for Quote (RFQ) No. AA-2026-05 for Flexible LMR Cables to be used in the Advanced Light Source Upgrade (ALS-U) project's Beam Position Monitor (BPM) system. This opportunity seeks qualified vendors to manufacture, test, and deliver approximately 1,068 specialized coaxial cable assemblies. Quotes are due by April 23, 2026.
Scope of Work
The requirement is for fire-rated LMR195 coaxial cable assemblies with SMA(M) connectors, in lengths of 2.0 ft, 2.5 ft, and 3.5 ft. These cables must meet stringent specifications including 50 ohms impedance, phase matching (+-10 picoseconds), and low insertion loss (S21 > 0.94 at 0.05-18 GHz, with LBNL open to lowering the upper frequency to 8 GHz). The scope includes a First Article approval process (8 weeks ARO for delivery, up to 12 weeks for LBNL approval) and 100% production testing. Deliverables include 1,068 tested and accepted cable assemblies in two batches, along with comprehensive documentation and QA data. Only LMR cable will be accepted; no equivalents.
Contract Details & Timeline
- Contract Type: Firm Fixed Price is preferred.
- Set-Aside: None specified. Offerors must state their small business status (NAICS 334419, Size Standard 750 employees).
- Place of Performance: Lawrence Berkeley National Laboratory, Berkeley, CA.
- RFQ Release: April 10, 2026
- Quotes Due: April 23, 2026
- First Article Delivery: 8 weeks After Receipt of Order (ARO).
- Production Batch Delivery: 8 weeks after First Article approval.
Submission & Evaluation
Offerors must submit quotes via email to Arielle Anoop (AAnoop@lbl.gov). Submissions must include certification of recent direct experience (within 2 years), ability to meet technical/manufacturing requirements, and acceptance of the Sample Subcontract terms. Required forms include the Rep Cert Form (if quote > $150K) and the Past Performance Reference Information Form. Evaluation will prioritize firm fixed price quotations and adherence to mandatory requirements. Compliance with LBNL's Sustainable Acquisition Program is also required.