BPM Cables (Semi Rigid) for ALS-U

SOL #: AA-2026-04Combined Synopsis/Solicitation

Overview

Buyer

Energy
Energy, Department Of
BERKELEY NATL LAB - DOE CONTRACTOR
Berkeley, CA, 94720, United States

Place of Performance

Berkeley, CA

NAICS

Other Electronic Component Manufacturing (334419)

PSC

Wire And Cable, Electrical (6145)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 13, 2026
2
Last Updated
Apr 29, 2026
3
Submission Deadline
May 5, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The University of California, Lawrence Berkeley National Laboratory (LBNL), on behalf of the Department of Energy (DOE), has issued RFP No. AA-2026-04 for Beam Position Monitor (BPM) Semi Rigid Cables for the ALS-U project. This opportunity seeks approximately 1,120 high-frequency, low-loss semi-rigid coaxial cable assemblies. Proposals are due May 5, 2026.

Opportunity Overview

LBNL is seeking qualified offerors to manufacture, assemble, test, and deliver critical BPM jumper cable assemblies for the upgraded Storage Ring (SR) at the Advanced Light Source (ALS-U) project. This will result in a fixed-price subcontract.

Scope of Work

The primary scope involves the production of approximately 1,120 high-frequency, low-loss semi-rigid 141 coaxial cable assemblies with right-angle SMA connectors. These cables must be suitable for accelerator environments, withstand vacuum bake-out temperatures up to 200 °C, and meet stringent performance standards. Key technical requirements include:

  • Precisely controlled impedance and phase matching (+-10 picosecond).
  • Low insertion loss (S21 > 0.97 from 0.05 – 18 GHz).
  • Non-magnetic properties (µ ≤ 1.08).
  • Right-angle SMA connectors rated up to 200 °C.
  • 100% production testing per the Acceptance Criteria List (ACL).

Deliverables & Schedule

Deliverables include the 1,120 tested cable assemblies, a First Article Inspection Report (FAIR), test results, and shipping documentation. Specific cable lengths are 525 mm, 650 mm, and an optional range of 525-725 mm.

  • First Article: Within 6 weeks After Receipt of Order (ARO).
  • Production Batch 1: Within 6 weeks after first article approval.
  • Production Batch 2: Within 12 weeks following completion and approval of Hold Point 2.

Contract Details

  • Contract Type: Fixed-Price Subcontract
  • NAICS Code: 334419 (Other Electronic Component Manufacturing)
  • Size Standard: 750 employees
  • Place of Performance: Berkeley, CA, United States

Set-Aside

None specified. However, offerors are required to complete Small Business Program Representations and other compliance certifications.

Submission & Evaluation

  • Questions Due: April 17, 2026, by 3 PM Pacific Time.
  • Proposals Due: May 5, 2026, by 3 PM Pacific Time.
  • Submission Method: Via email to AAnoop@lbl.gov.
  • Evaluation Criteria (in order of importance): Ability to Meet Technical Requirements, Delivery & Schedule, Manufacturing Capabilities and Capacity, Past Performance Producing Similar Products, and Quality Assurance. Award will be based on best overall value, not necessarily the lowest price.

Required Forms & Attachments

Bidders must submit the following forms with their proposal:

  • RFP and Proposal Preparation Instructions
  • Statement of Work (SOW)
  • Acceptance Criteria List (ACL)
  • Sample Subcontract
  • Rep Cert Form (AA-2026-04)
  • Price Proposal Schedule, Attachment A
  • Past Performance Reference Information Form
  • ALS-U Quality Evaluation Survey

Contact Information

Primary Contact: Arielle Anoop (aanoop@lbl.gov)

People

Points of Contact

Arielle AnoopPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3
Combined Synopsis/Solicitation
Posted: Apr 29, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Apr 27, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 13, 2026
View