Brake Carrier Assembly

SOL #: FA481926Q003Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4819 325 CONS PKP
TYNDALL AFB, FL, 32403, United States

Place of Performance

Tyndall AFB, FL

NAICS

Other Aircraft Parts and Auxiliary Equipment Manufacturing (336413)

PSC

Aircraft Landing Equipment (1710)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 30, 2026
2
Last Updated
Feb 11, 2026
3
Submission Deadline
Feb 17, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force (FA4819 325 CONS PKP) at Tyndall AFB, FL, is soliciting quotes for 80 Brake Carrier Assemblies (P/N: 52E901-1 Rev G). This acquisition, under solicitation number FA481926Q0003, is a Total Small Business Set-Aside and will be awarded as a Firm Fixed-Price contract using Simplified Acquisition Procedures. Quotes are due by February 17, 2026, at 01:00 PM CST.

Scope of Work

The contractor will furnish all necessary parts, equipment, material, freight, and labor to provide 80 Barrier Arresting Kit (BAK)-12 Brake Carrier Assemblies to CEMIRT, AFCEC/COMX at Tyndall AFB. Key requirements include adherence to USAF drawings (52-E-901, Rev: G), ASME Y14.1/Y14.5 standards, and AWS D1.1 for welding and inspection. The assemblies require ASTM B633, SC3 Type II coating. Revised drawings must be submitted and approved by AFCEC/COMX prior to starting work.

First Article Test (FAT) Requirements

Contractors must either possess existing FAT approval from AFLCMC and have delivered production units within the last three years, or successfully complete FAT as outlined in the SOW. Notably, vendors who have delivered Brake Carrier Assemblies in accordance with USAF TDP 201018898 standards within the last three years are considered FAT approved. FAT approval must be obtained no later than 285 calendar days after contract award. PDF drawings are due within 60 days of contract award, with the first article submission due no later than 180 days after government drawing review.

Contract Details

  • Contract Type: Firm Fixed Price (Simplified Acquisition Procedures)
  • Quantity: 80 each Brake Carrier Assemblies
  • Delivery: Within 465 Calendar Days from Date of Award, FOB Destination
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS: 336413 (Aircraft Landing Equipment), Size Standard: 1250 employees

Submission & Evaluation

Offers must be submitted electronically in two volumes:

  • Volume 1 (Price): Proposed pricing for CLIN 0001, including unit price, extended price, and all transportation/delivery charges.
  • Volume 2 (Technical): A Technical Approach detailing tools, equipment, personnel, and facilities, along with documented evidence of FAT approval or a detailed schedule for FAT milestones. Award will be made to the offeror providing the best value to the Government, based on Price and Technical factors.

Key Dates & Contacts

People

Points of Contact

SrA Mason Smith-WashingtonPRIMARY
SSgt Benjamin SpearSECONDARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 3Viewing
Solicitation
Posted: Feb 11, 2026
Version 2
Solicitation
Posted: Feb 6, 2026
View
Version 1
Solicitation
Posted: Jan 30, 2026
View
Brake Carrier Assembly | GovScope