Brandon Road Interbasin Project Industry Day - 7 April 2026
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers (USACE), Rock Island District, is hosting an Industry Day for the Brandon Road Interbasin Project on Tuesday, April 7, 2026, from 8:30 AM to 12:00 PM CT in Davenport, Iowa. This event is a Special Notice to provide contractors with awareness of an upcoming construction contract, specifically focusing on Increment II – Flushing Lock and Right Descending Bank Construction, and to solicit industry feedback on design improvements for efficiency and cost-effectiveness.
Project Overview
The Brandon Road Interbasin Project is a significant infrastructure initiative designed to prevent Invasive Species, particularly Invasive Carp, from establishing in the Great Lakes. The project involves constructing a series of deterrent measures, including electric, hydroacoustic, and bubble systems, within the lock chamber and approach channel, while maintaining river navigation. The overall project is divided into three construction increments:
- Increment I: Leading Edge (Automated Barge Clearing, Bubble Curtain, Acoustic Deterrent, Support Facilities, Upstream Boat Ramp, Channel Rock Excavation)
- Increment II: Flushing Lock and Right Descending Bank (Flushing Lock, Right Descending Bank Wall, Channel Rock Excavation)
- Increment III: Engineered Channel (Electric Deterrent, Acoustic Deterrent, Support Facilities Building, Engineered Channel Floor & Walls, Downstream Boat Ramp)
Industry Day Focus & Details
The Industry Day presentation will concentrate on Increment II, providing detailed information on its scope, timeline, and specific requirements. Attendees will have the opportunity to:
- Learn about the project background, construction phasing, and sequencing.
- Review the status and details of the Increment II design.
- Participate in a Q&A session with USACE representatives and project engineers.
- Provide valuable feedback to improve design for more efficient and cost-effective construction.
- Network with potential prime contractors, subcontractors, and suppliers.
Draft plan sets for the Flushing Lock and Right Descending Bank Wall are available for review, offering preliminary design information, engineering drawings, site plans, and construction sequencing details for the project located at the Brandon Road Lock & Dam in Joliet, Illinois.
Contract & Timeline
- Opportunity Type: Special Notice (Industry Day)
- Product Service Code: Y1QA (Construction Of Restoration Of Real Property)
- Set-Aside: None specified
- Industry Day Date: April 7, 2026, 8:30 AM - 12:00 PM CT
- Published Date: March 27, 2026
Action Item
Interested parties must register for the Industry Day via the provided link: https://forms.osi.apps.mil/r/EGBRszaBQX.